My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_1986-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:32:19 AM
Creation date
6/3/2020 9:43:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2006
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_1986-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. On Site Work Plans: <br />Work party consisting of 2 persons will perform the <br />following tasks: <br />Project Team Leader: Function: <br />Edward Herbst HAZMAT TECH 1 <br />ttor.lc Party -11:1: <br />Mark Kahl HAZMAT TECH 1 <br />Robert L. Pettus Operator #1 <br />G. All emergency services are available by dialing 911 on the <br />telephone located in my vehicle. This vehicle will be on <br />site at all times. <br />1-1. The following environmental monitoring instruments shall be <br />used on site at specified intervals. <br />Explosion Meter.: To check tank for t;ransportnti.on. <br />02 hionit-or.: To chock t, -ink for, transportation. <br />The work party was briefed on the contents of this plan at: <br />A tailgate menti ngon site. <br />X111 site personnel have read the above plan and are familiar <br />with its provisions. <br />(Name) (signature) <br />Site Safety Officer: Mark Kahl <br />Project Team Leader: Edward Herbst <br />Other Site Personnel: <br />
The URL can be used to link to this page
Your browser does not support the video tag.