Laserfiche WebLink
eft / X) 1 //`V, //0,W A3C, <br /> UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED UST OPERATOR MONTHLY INSPECTION REPORT <br /> Designated <br /> I,acility Name: Ad Inspection Date: <br /> I J <br /> Facility Address:47 City: <br /> Facility <br /> sjj <br /> Name of Designated UST Operator Conducting Inspectio, <br /> International Code Council Certification o.: ~^ 9P Expiration Date: <br /> Signature- Phone: 09=7442x&Uaj <br /> N/A=Not A ficable <br /> Item MONITORING PANEL ALARM HISTORY Yes No N/A <br /> 1. is the m-­­;­s stem owered on and in proper operati D <br /> 2. Is the mo—f-j——c'" not currently showing_at leak alarms? FE <br /> 3. is the Alarm History ReportJlog for the previous month available,and has it been reviewed by the � 0 El <br /> Desi nated UST Operator? (Attach a copy.of the alarm history reportl7o.to this inspectionfiorm.) <br /> 4. Has <br /> each alarm for the previous month been responded to a ro a lately? <br /> UST SYSTEM INSPECTION <br /> 5. Are tank-top containment sumps free of water,debris,and hazardous substance? Note:if the answer to Item 4 was"Yes, Ail? <br /> to Item 6. Sunips where an alarm has occurred in the past inonth must be inspected if a qualified service technician has not responded to,and <br /> =01�r-�l�.addi-essed,th,ecaiiseofthealami.Docuiient nveridnga opriate service should be attached to this report. <br /> Yes <br /> NO <br /> Yes No N <br /> Sump Location: _X ❑ Sump Location: Q El <br /> Sump Location: ❑ Sump Location: <br /> 6. Are spill buckets, containment structures)free of water debris,and hazardous substance? <br /> Yes No N Yes No N/A <br /> Tank I ID- Q ❑ Tank 4 ID- <br /> Tank 2 ID- Tank 5 ID- <br /> Tank 3 ID- ❑ El <br /> 7. Are under-dispenser containment areas free of water,debris,and hazardous substance? <br /> /]4A Tank 4 ID- <br /> Tank 5 ID- <br /> Tank 6 ID- FT <br /> Yes I Na I N/A Yes No N/A <br /> I <br /> Dispenser-1/2 F-I F1 Dispenser-9/1.0 I LJ <br /> Dispenser-3/4 Dis enser-11/12 <br /> -5/6 <br /> Dispenser Dispenser 13/14 ❑ <br /> Dispenser-7/8 Lj I D I D Dispenser-15/16 <br /> 8. Leak detection is property located within under-dispenser containment. <br /> Yes I No N/A I Yes No N/ <br /> Dispenser-1/2 Dispenser-9/10 D El LJ <br /> Dispenser-3/4 <br /> Dispenser-11/12 <br /> R F1 F <br /> Dispenser-5/6 El F] ❑ Dispenser-13114 ❑ <br /> Dispenser-7/8 ❑ -Dispenser-15/16 <br /> PAPERWORK.INSPECTION Yes No N/A Date Done <br /> 9. Monitoring System Certification was completed within the past 12 months? Jr I El F] 1A-11nQ_(e_ <br /> 10. Line Leak Detectors were tested/certified within thepast 12 months? El I Q F] <br /> 11, Spill bucket(containment structure)testinR completed within the past 12 months? /,6-1 0/_ <br /> j5 <br /> F12. Line tightness testing corn feted within the required time frame? <br /> 14 3. El Il- 2 <br /> 13. Secondary containment tests completed within the required time frame? F <br /> 14. Enhanced Leak Detection completed within the required time frame? _ <br /> 15. 1 Other required testing/maintenance was completed within required time frame? (List test/maintenance items below.) <br /> Describe Test/maintenance: I Lj I " I Lj <br /> Describe Test/Maintenance: I Ej I L1 ❑ <br /> FACILITY EMPLOYEE TRAINING Yes No N/A <br /> 16. Have all facility employees received the required on-thejob trainin within the past year? <br /> 17. Have all facilitX ern2loyees hired within the past 30 da s received the required on-thejob traininS.? ❑ <br /> Note: Explain any"No"answers in the"Comments"section on the following page.Those issues require corrective action from <br /> the UST owner/operator. <br /> IIN-057-1/2 www.oiiiidoes.org 9126/05 <br />