Laserfiche WebLink
' 09-04-'08 10;19 FROM-Western Pump, Inc. 619-236-7406 T-530 P018/019 F-786 <br /> Suggested specification for <br /> UL/ULC Listed Red Thread®IIA Piping System <br /> 2.06 Acceptable Manu.farturers_ Fiber Glass 3,g5 S1jrnp P nitrations_ Sump penetrations shall <br /> Systems, Smith Fibercast, 501-618-2203, or approved be made by means of a permanently bonded FRP <br /> equal. coupling. The coupling shall be capable of adjusting <br /> for the slope of the piping system entering or exiting <br /> Section 3-Matertat and Construction the sump wall. <br /> 3.01 2'°-4" Primary Pine and V-Q" Secondary <br /> 21M. The pipes all be manufactured by the 3.06 Adhesives. Adhesives shall be manufacturer's <br /> filament winding process using an amine cured standard for the piping system specified. <br /> epoxy thermosetting resin to impregnate strands of <br /> continuous glass filaments, which are wound around 3.07 AcCglatabla Products. RED THREAD 11A <br /> a mandrel at a 543/4" winding angle under controlled Piping System as manufactured by FGS Smith <br /> tension. The pipe shall be heat cured and the cure Fibercast or engineered approved equal. <br /> shall be confirmed using a Differential Scanning <br /> Calorimeter. SECTION 4-Installation and Testinq <br /> Pipe shall be supplied with T.A.B. (Threaded and a 01 Training and Certification. All Dints installed <br /> Bonded) or plain ends. 1 <br /> Pipe shall have a minimum continuous cyclic or constructed in the field shall be assembled by <br /> pressure rating of 125 psig at 150°F in accordance employees of the contractor who have been trained by <br /> with ASTM D2992, Procedure A or UL 971 pressure the pipe manufacturer. The pipe manufacturer or their <br /> rating. authorized representative, shall train the contractor,'s <br /> employees in the proper joining and assembling <br /> All pipe, both primary and secondary, shall be procedures required for the project, including hands- <br /> 100% hydrotested at the factory before shipment at a on participation by the contractor's employees. Each <br /> minimum pressure of 265 psig and shall be UL 971- bonder shall fabricate one pipe-to-pike and one pipe- <br /> 2004 Listed and Labeled. to-fitting joint that shall pass the minimum pressure <br /> test for the application as stated in Section 2.03 <br /> 3.02 ASTM D2310 Classifications (at 73,4°Fl without leaking. <br /> Primary Pipe Secondary Pipe Only bonders that have successfully completed <br /> 2"- 3" RTRP-11AF 3" RTRP-11AF the pressure test shall bond pipe and fittings. Each <br /> bonder shall carry a current, manufacturer proof of <br /> 411 RTRP-11AH 4 RTRP-11AH training card. <br /> (Mechanical properties cell classifications shown are <br /> minimums.) 4.02 Plae Installation. Pipe shall be installed as <br /> specified and indicated on the drawings. <br /> 3.03 Fittings. All fittings shall be manufactured using The piping system shall be installed in accordance <br /> the same type of material as the pipe. Fittings may be with the manufacturer's current published installation <br /> manufactured either by compression molding, filament procedures. <br /> winding, resin transfer molding or contact molding <br /> methods. All fittings, adapter, and sump penetrations <br /> shall be UL971-2004 Listed. 4.03 Testing. A hydrotatic pressure test shall be <br /> Primary fittings shall be adhesive bonded, matched conducted on the completed piping system. The <br /> tapered bell and spigot and rated the same as the piping system shall be subjected to 10 pressurization <br /> pipe cycles from 0 psig to 1.5 times the design operating <br /> pressure as stated in Section 2.03.c. After the 10 <br /> Secondary containment fittings shall be two-piece cycles, the pressure shall be held on the system for a <br /> style to allow for 100% inspection of the primary joint minimum of 1 hour and the line inspected for leaks. <br /> pressure test and be rated to a minimum of 50 psig Test pressures shall not exceed 1.5 times the <br /> per UL 971-2004. maximum rated pressure of the lowest rated element <br /> Should hydrostatic testing be impractical, testing in the system. <br /> with low pressure air or inert gas may be acceptable. <br /> Extreme caution should be used when testing <br /> with air. Follow all safety precautions and testing All pipe joints shall be water tight. All joints that are <br /> recommendations of the pipe manufacturer. found to leak, by observation or during testing shall be <br /> replaced by the contractor and retested. <br /> 3.04 Connections. Connections to flex connectors <br /> or other piping materials shall be made by the use Should hydrostatic testing be impractical, testing with <br /> of NPT (National Pipe Thread) threaded adapters or low pressure air or inert gas may be acceptable. <br /> flanges bonded to the FRP piping system. Extreme caution should be used when testing <br /> with air. Follow all safety precautions and testing <br /> recommendations of the pipe manufacturer. <br />