Laserfiche WebLink
Pagel of 3 <br /> Michelle Henry [EH] <br /> From: Dejan Ristic[dejanr@westernpump.com] <br /> Sent: Tuesday, September 02, 2008 11:24 AM <br /> To: Michelle Henry[EH] <br /> Cc: Derek Rethmeier; Diana Duarte; Ryan Rethmeier; Michael Mizicko <br /> Subject: RE: 975 Fairmont, San Joaquin EHD SR000052929-Submittal for Smith Fibercast- URGENT!!! <br /> Hello Michelle, <br /> Typical install consists of a an FRP bell by male adapter which is screwed into the <br /> tank. Then primary 4" FRP pipe is glued to the bell by male. Total length/height <br /> is 40" approximately including the fittings. On top of the riser we have a cap <br /> which is a Veeder Root component (cap/adapter with vent) as part of the dual float <br /> hydrostatic sensor installation. <br /> Thanks. <br /> Best Regards, <br /> Dejan Ristic <br /> Western Pump, Inc. <br /> 3235 "F" Street <br /> San Diego, CA 92102-3315 <br /> Office: 619.578.2193 <br /> Cell: 619.446.9043 <br /> Fax: 619.236.7406 or 239. 9925 <br /> From: Michelle Henry [EH] [mailto:mhenry@sjcehd.com] <br /> Sent: Tuesday, September 02, 2008 11:15 AM <br /> To: Dejan Ristic <br /> Subject: RE: 975 Fairmont, San Joaquin EHD SR000052929 - Submittal for Smith Fibercast- URGENT!!! <br /> Hi Dejan, <br /> Thank you for the submittal, I need something describing how you are using the AO Smith Piping-Annular riser, <br /> length, single-wall, double-wall, etc. <br /> Michelle D.Henry,REHS <br /> 600 E Main Street <br /> Stockton CA 95202-3029 <br /> (209)953-7699 phone <br /> (209)468-3433 fax <br /> mhenry@sjcehd.com <br /> From: Dejan Ristic [mailto:dejanr@westernpump.com] <br /> Sent: Tuesday, September 02, 2008 11:09 AM <br /> To: Michelle Henry [EH] <br /> Cc: Derek Rethmeier; Sanburn, Cliff; Hopper, Dave; Tony Sansavera; Diana Duarte; Ryan Rethmeier <br /> Subject: 975 Fairmont, San Joaquin EHD SR000052929 - Submittal for Smith Fibercast- URGENT!!! <br /> 9/3/2008 <br />