Laserfiche WebLink
SWRCB,January 2002 Page a of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: "iping Manufacturer L1Industry Standard F3 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: idPssure ElVacuum LlHydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: re,, (, tru,r :s a ki PSS I LW1 Equipment Resolution: <br /> Piping Run#-I- Piping Run# 2 Piping Run# i Piping Run# <br /> 1 <br /> Piping Material: ' <br /> Piping Manufacturer: i4 P 7` P l <br /> Piping Diameter: 1 y2� v t) (t 120 U j <br /> Length of Piping Run: /� y� 3 �-\ r�r,�•C, 3 L 1 <br /> Product Stored: �} r f q <br /> Method and location of �-®s+I,oG.�_ ent4- t-r S4-L,00_f.e<..g- !� <br /> i in -run isolation: uu, <br /> [,Wait-tibetween applying / <br /> ressure acuum/water and r <br /> starting test: r ' <br /> Test Start Time: .00 <br /> i <br /> Initial Reading(111): <br /> PST <br /> Test End Time: d <br /> Final Reading(RF): 5"1�2-5 T- 5 <br /> 1`< <br /> 5 <br /> Test Duration: / G10 u ,- <br /> Change in Reading(RF-R,): 19 fP. <br /> Pass/Fail Threshold or t <br /> Criteria: jo0JV- <br /> Test Result: Pass ❑Fail ass ❑ Fail / 0 Pass ❑ Fail\ ❑ Pass ❑ Fail <br /> Comments-(include information on repairs made prior to testing and recommended follow up for failed tests) <br />