My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page a of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: "iping Manufacturer L1Industry Standard F3 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: idPssure ElVacuum LlHydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: re,, (, tru,r :s a ki PSS I LW1 Equipment Resolution: <br /> Piping Run#-I- Piping Run# 2 Piping Run# i Piping Run# <br /> 1 <br /> Piping Material: ' <br /> Piping Manufacturer: i4 P 7` P l <br /> Piping Diameter: 1 y2� v t) (t 120 U j <br /> Length of Piping Run: /� y� 3 �-\ r�r,�•C, 3 L 1 <br /> Product Stored: �} r f q <br /> Method and location of �-®s+I,oG.�_ ent4- t-r S4-L,00_f.e<..g- !� <br /> i in -run isolation: uu, <br /> [,Wait-tibetween applying / <br /> ressure acuum/water and r <br /> starting test: r ' <br /> Test Start Time: .00 <br /> i <br /> Initial Reading(111): <br /> PST <br /> Test End Time: d <br /> Final Reading(RF): 5"1�2-5 T- 5 <br /> 1`< <br /> 5 <br /> Test Duration: / G10 u ,- <br /> Change in Reading(RF-R,): 19 fP. <br /> Pass/Fail Threshold or t <br /> Criteria: jo0JV- <br /> Test Result: Pass ❑Fail ass ❑ Fail / 0 Pass ❑ Fail\ ❑ Pass ❑ Fail <br /> Comments-(include information on repairs made prior to testing and recommended follow up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.