Laserfiche WebLink
y <br /> S W RCB,January 2002 Page t of <br /> 9. SPILLJOVERFILL CONTAINMENT BOXES <br /> Facility is Not E ui ed With S ill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑ Industry Standard 1_7 Professional Engineer <br /> a Other(Specify) <br /> Test Method Used: C; Pressure <br /> L Vacuum lj' Hydr9static <br /> ❑Other(.Specify) _ <br /> Test Equipment Used:., Equiprperit Resolution: <br /> "Spill Box# Spill Box#��'! Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: . <br /> Initial Reading(Ri): <br /> Test End Time: , <br /> Final Reading(RF): <br /> Test Duration• <br /> Change iw eading(RF-Rj): <br /> Pass/VAil Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> {Comments—(include information on repairs made prior to testing, and recommended ollow-u for ailed tests) <br /> P41, <br /> A,,,�rgs 1,fvr °sr 7 vy t <br /> I <br />