My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> RE: Lodi Memorial Hospital 975 S. Fairmont Lodi, CA 95240 (SR0055680) <br /> 5. Any changes in information and scope of work must be submitted to EHD for <br /> approval prior to commencing work. All new addenda supersede the previous <br /> ones. <br /> 6. Contact Aris Cacapit to arrange the following inspections (a 48 hour notice is <br /> required): <br /> a. One hour hydrostatic test (or equivalent) on the diesel spill bucket after <br /> concrete is poured. <br /> b. Verify the spill container has a minimum capacity of 5 gallons. <br /> c. Verify corrosion protection prior to backfill and pouring concrete. <br /> d. The test fluid should cover the top joint, and be no less than 1.5 inches <br /> below the top of the spill bucket, regardless of the spill bucket's capacity <br /> for the diesel spill bucket. <br /> e. Test operation of the drain valve of the diesel spill bucket. <br /> 7. Since concrete will be broken over the UST, a third party tank integrity test and/or <br /> line integrity test(or equivalent)must be performed, once concrete is poured in <br /> accordance with the manufacturer's guidelines. Results must be received by the <br /> EHD within seven days of returning the facility to operating condition. <br /> 8. A "Certificate of Compliance for Underground Storage Tank Installation Form C" <br /> shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(d)] <br /> before this repair will be considered complete by the EHD. <br /> If you have any further questions, please contact me at(209) 468-/3453, fax to (209) 468- <br /> 3433 or email to acacapit@sjcehd.com. <br /> Thank you, <br /> *S C-�- <br /> Aris Cacapit <br /> Environmental Health Specialist <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.