My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> t <br /> s <br /> Dual-Point Hydrostatic Sensor Installation <br /> 1. Turn Off power to the console. <br /> 2. Lower the sensor into the riser until it rests on the bottom of the reservoir(see Figure 2).Note:Refer to the <br /> tank manufacturer's instructions for setting the proper brine levels.The ideal brine solution level is <br /> approximately halfway between the high and low water levels.With the Dual-Point Sensor resting on the <br /> inner-tank wall,the sensor will alarm when the brine level is below 2°or when the brine level is above 12. <br /> 14"min.dia. <br /> manhole Cord grip nuttbushing <br /> / (vent cap not shown) <br /> Concrete slab 8 a a <br /> or packed earth p <br /> per NFPR N <br /> Riser pipe cap Seal-off <br /> Dual-point Weatherproof 112"rigid <br /> hydrostatic sensor junction conduit <br /> (to Console) <br /> Float <br /> Brine level <br /> Reservoir <br /> Double-wall <br /> tank <br /> 6ensoreV�89enaReAs <br /> Figure 2. Dual-Point Sensor Installation(shown with plastic riser cap) <br /> 3. Riser Cap Installation <br /> a. If you have the plastic riser cap kit <br /> { Place the cord grip bushing into either of the threaded fittings in the plastic cap and screw the cord grip <br /> nut over the bushing.With the nut loose,push the end of the sensor cable through the cord grip.Place <br /> the cap in the riser and snap down the cap lever to seat the gasket against the inside of the pipe.Screw the <br /> vent cap from the kit down snugly onto the other threaded fitting of the riser cap. <br /> b. if you have the metal riser cap and vent tube <br /> Install the vent tube into one of the cord grips in the metal riser cap(ref.Figure 5 on page 7)and tighten <br /> the cord grip.Loosen the other cord grip and push the sensor cable through it.Place the cap in the riser <br /> and snap down the cap lever to seat the gasket against the inside of the pipe. <br /> 4. With the sensor still resting on the bottom of the reservoir,leave a little slack in the sensor cable and tighten <br /> the cable cord grip nut. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.