My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2009-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:20:05 PM
Creation date
6/3/2020 9:44:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2014
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2009-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> A R C H I T E C T U R E ENGINEERING EN V IRON MEN T A L S E R V I C ES <br /> -THY L <br /> ® GROUP INC. 1137 N. McDowell Blvd., Petaluma, CA 94954 Telephone: (707) 765-1660 Facsimile: (707) 765-9908 <br /> John W.Johnson March 14, 2003 <br /> Co-President John Rowe <br /> Architect Diversified Products Mfg. LLC <br /> 5523 Bagget-Marysville Road <br /> Brian F.Zita Oroville, CA 95965 <br /> Co-President RE; THIRD PARTY APPROVAL <br /> Architect CCR Title 23 Division 3, Chapter 16 Section 2631(d) <br /> John B.Hicks SPLIT REPAIR PRODUCTS <br /> Vice President Split Repair Boots RB 4,RB 8,RB 10 RB 12 RB 14 <br /> Split Terminating and Test Reducers <br /> Cecil R.Spencer Spit Inserts <br /> Vice President Repair Boot Installation Kit RBIK <br /> Bulkhead Bonder DBB <br /> Bulkhead Cleaner DBC <br /> Bulkhead Fill DBF <br /> Regional Managers Zip Tite DGK <br /> Jesse E.Macias <br /> Roy W.Pedro I have reviewed the following materials on these products: <br /> Alan K.Shimabukuro 1. Material specifications,test reports and data sheets. <br /> John W.Strobel 2. Manufacture's Installation Instructions. <br /> Blythe R.Wilson 3. Manufacture's Application Bulletins <br /> 4. Representative samples of items. <br /> 5. Manufacture's Master Catalog <br /> In my opinion the design of these products as shown in the manufacture's materials are based on <br /> sound engineering principles and the materials are compatible with all motor fuels and additives <br /> currently being used. <br /> RHI.,DESIGN GROUP,INC. %0FESslo, <br /> ,�k' ��4.5 N. req �`•& <br /> James H. Ray No.24,518 9; <br /> Offices Senior Civil Engineer * k;165 ,4 <br /> BELLEVUE, WA AML <br /> rF0�f <br /> LA HABRA, CA <br /> MARTINEZ, CA <br /> PETALUMA, CA <br /> SACRAMENTO, CA <br /> SCOTTSDALE, AZ <br /> VANCOUVER, WA <br /> www.rhldesign.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.