Laserfiche WebLink
t <br />J <br />UST SYSTEM RETROFIT OR REPAIR <br />k(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES <br />fl NO [7 <br />{ 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates <br />for each <br />person installing or tasting any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Tifle 8. <br />3. Detailed description of work to 6e completed. List <br />components to be re <br />wn <br />to scales aired or <br />showing P re lace <br />w d <br />g location of re P and attach a d' <br />airs a diagram <br />p and/or replacements. am dr <br />addin P acements. If repairing a component, describe how this will be done (If <br />_g piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />W <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval).- <br />3 <br />pproval). <br />3 <br />