Laserfiche WebLink
AWL <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> I Site map enclosed? YES[] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (if <br /> adding piping, UDC's, or other LIST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> S3 no vac in fault, replaced Veeder-Root 463 sensor like for like. <br /> 4. List of equipment to be used(Attach manufacturers specification sheets showing third-party approval): <br /> (1) Veeder-Root 330020-463 <br /> E-D <br /> 5 201.7 <br /> ENVI RON MENTA l—UEA4;;:l:H <br /> DEPARTMENT <br /> EH230038(reAsed 12-11-15) 3 <br />