My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2015-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 2:14:17 PM
Creation date
6/3/2020 9:44:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2018
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2015-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> X <br /> 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> ® ciW 05 <br /> Facility Address: Service Request#: <br /> Onsite Service Technician's Name: ICC Service Technician/installer Exp.Date: Manufacturer Training: <br /> S-T -, -311(d1 <br /> Vr / <br /> SERVICE SERVICE <br /> Leak detector Spill bucket 0 minimum 5 gallon <br /> ❑ El mechanical Model: El El 1 hour hydrostatic 0 Incon TS-STS <br /> • electronic Serial#: El Caldwell System El Other <br /> 0 line test programmed <br /> Leak detector Spill bucket 0 minimum 5 gallon <br /> ❑ 0 mechanical Model: El El 1 hour hydrostatic El Incon TS-STS <br /> • electronic Serial: <br /> El Caldwell System El Other <br /> 0 line test programmed <br /> sensor Primary piping testing at: <br /> El El positive shutdown Model: El psi <br /> El fail safe Serial#: minutes <br /> El NA <br /> — sensor Secondary containment testing for: <br /> El 0 positive shutdown Model: UDC(s) Piping <br /> 0 fail safe Serial#: Sump(s) LIST(s) <br /> El NA sensor E3 Testing for the above components are next due by: <br /> ❑ 0 positive shutdown Model: <br /> 0 fail safe Serial#: Note Please be aware that 2*containment components are required to be tested upon <br /> 0 NA I installation,6 months after,and every 36 months thereafter. <br /> F-1 Drop tube with mechanical overfill at 95% El Cold start of monitoring panel <br /> El Drop tube with mechanical overfill at 95% El I Corrosion protection <br /> El Overfill prevention (see LG letter 150-1) Other: see below \IVti <br /> 0 This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> 0011�11, 0('A r--1 Slkn Dot\" LUA )rrm <br /> 114- <br /> gar, <br /> cDpn M \1" Vic "Ass <br /> THIS FACILITY IS SUBJECT TO REINSPECTI AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector:k Receive y: Tit <br /> EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 4/30/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.