Laserfiche WebLink
RECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR OCT 10 2016 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> ENVIRONMENTAL HEALTH1. Site map enclosed? YES[I NO[] DEPARTMENT <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> addinpiping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Install 5 sump monitor ports for DW sump communication inspection. <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> All parts are Western Fiberglass parts. <br /> PT#AC1040 Resin and Catalyst <br /> PT#AC8025 Fiberglass Mat <br /> PT#AC1070 Acetone <br /> Grinding Wheel 24 Grit,Shop towels or clean regs <br /> PT#P10012 Western Fiberglass Stainless Steel Port Fitting <br /> PT#DWAC4500 Bonder <br /> EH230038(revised 12-11-15) 3 <br />