Laserfiche WebLink
ARCO Facility <br />in <br />EM <br />0 0 <br />MONITORING & RESI!ONSE PLAN <br />ARCO PRODUCTS COMPANY <br />WITH <br />1 <br />2133 <br />CA 1111-111111le-11 WINTPUIPhya• • 1 <br />Address 2908 Benjamin Holt Dr. <br />Stockton, CA <br />DETECTION METHOD <br />Tanks - Statistical Inventory Reconciliation (SIR) and Biennial Tank Integrity Testing in <br />accordance with SWRCB LG -123-1 and Section 2643 (c)(1), Article 4, <br />Title 23, CCR. <br />lanes - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br />accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br />MONITORING EQUIPMENT - <br />The Automatic line leak detectors shall be maintained and inspected according to the <br />manufacturer's instructions by an outside contractor once during each calendar year. <br />reconciliationInventory be performed in compliance with the details of c <br />A Inventory volume measurements for product inputs, withdrawals, and the amount <br />remaining in the tank shall be recorded daily. <br />B. -. equipment s • • i.takeinventoryreadings 1. -:in• • o.•working orderand <br />capable of measuring the product level over the full range of the tank's height to the <br />nearest one-eighth of <br />a Product inputs shall be reconciled with delivery receipts by measurement of the tank <br />inventory volume before and after delivery. <br />D. Deliveries shall be made through a drop tube that extends to within six inches of the <br />tank bottom. <br />E Meters used for determining inputs . • withdrawals shall comply <br />