Laserfiche WebLink
• <br />The measurement of any water level in the bottom of the tank shall be made to the <br />one-eighthnearest of <br />G The UST system shall have tank charts that have been calibrated from empty to full in <br />one-eighth inch increments. Tank charts shall clearly indicate for which tank they are <br />calibrated, and shall not be used for more than one tank. <br />'•. <br />(ExhibitA On the first business day of each calendar month, operator shall provide required data <br />: .. <br />reconciliationB. Submit annual <br />agency within 15 days following the end of the last month of • period <br />covered by the report. <br />ARCO RESPONSIBILITIE <br />inconclusiveA Provide notification to the local implementing agency of all inconclusive or failed <br />reports within 10 days from receipt of the report from the SIR company. In no event <br />shall this notification be provided later than the 30th day of the month following the <br />or failed report. <br />PerformB. tankintegrity test within 15 calendar days when two successive monthly <br />reportsstatistical inventory • of 0.2 gallonper • <br />hoursa Report the occurrence as a "suspected release* to the local implementing agency with <br />72 r the second statistical inventoryreport. <br />D. H a tank Integrity test confirms the Initial results. Perform requirements <br />of <br />Aow <br />• <br />Take tank level measurements <br />':.. dispenser <br />Inspectequipment <br />- Recognize warning signs: dispenser hesitations, meter spins and odors <br />- Manually close dispenser impact <br />Replacedispenser <br />emergency- Shut down the system with and location of : ARCOmatic switch, electrical panel <br />breakers, and off switch <br />