My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1987-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 4:35:41 PM
Creation date
6/3/2020 9:44:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1995
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1987-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO PRODUCTS COMPANYi <br />SINGLE WALL AND -SINGLE <br />ARCO Facility — �? Address 0908 kb, <br />Tanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance <br />with Sections 2646 and 2643(c)(2)(A) and (B), Article 4, Title 23, CCR. <br />Lines - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br />accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br />[III-1111it-16if, INCE I Witt' It (1011 lzm • • <br />inventory«. _ performed _ _ <br />ils of Section 2646, <br />Article 4, Title 23, CCR (copy attached and hereby incorporated). <br />A. The daily variation in inventory reconciliation shall be the difference between <br />physically measured inventory In storage and the calculated inventory in storage. <br />B. The physically measured inventory shall be determined at approximately the same time - <br />each day by taking liquid level measurement (stick reading) and converting it to <br />gallons usin• a calibration <br />a The calculated inventory shall be determined at approximately the same time of day for <br />each business day by adding the inputs and subtracting the withdrawals from the <br />physically measured inventory determined the day before. <br />D. These variations shall be summed for a period of • _ month.•variations <br />exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons <br />must be ; • in accordanceinstructions <br />ExhibitSee s reconciliation • <br />
The URL can be used to link to this page
Your browser does not support the video tag.