Laserfiche WebLink
ARCO PRODUCTS COMPANYi <br />SINGLE WALL AND -SINGLE <br />ARCO Facility — �? Address 0908 kb, <br />Tanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance <br />with Sections 2646 and 2643(c)(2)(A) and (B), Article 4, Title 23, CCR. <br />Lines - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br />accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br />[III-1111it-16if, INCE I Witt' It (1011 lzm • • <br />inventory«. _ performed _ _ <br />ils of Section 2646, <br />Article 4, Title 23, CCR (copy attached and hereby incorporated). <br />A. The daily variation in inventory reconciliation shall be the difference between <br />physically measured inventory In storage and the calculated inventory in storage. <br />B. The physically measured inventory shall be determined at approximately the same time - <br />each day by taking liquid level measurement (stick reading) and converting it to <br />gallons usin• a calibration <br />a The calculated inventory shall be determined at approximately the same time of day for <br />each business day by adding the inputs and subtracting the withdrawals from the <br />physically measured inventory determined the day before. <br />D. These variations shall be summed for a period of • _ month.•variations <br />exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons <br />must be ; • in accordanceinstructions <br />ExhibitSee s reconciliation • <br />