Laserfiche WebLink
V-- j. A statement from the lining applicator confirming that the materials that will be used are the same <br /> materials that were evaluated by the testing organization. <br /> N�k. A statement from the lining applicator confirming that the processes that will be used are the same <br /> processes that were evaluated by the testing organization. <br /> }k I. A description of tank lining processes to be used by the applicator. <br /> m. A statement from the company that received the evaluation describing training provided to the <br /> authorized applicator. <br /> 10. Which of the following unexpired contractors licenses does the 4ipiae-SppficatQr-trave: (Please submit a copy <br /> of the license to PHS-EHD) <br /> General Engineering Contractor(A) <br /> / Limited Specialty/Service Station Maintenance(C-61/040) <br /> Limited Specialty/Synthetic Products (C-61/012) <br /> Limited Specialty/Protective Coating (C-61/051) <br /> Painting and Decorating (C-33) <br /> 11. Is the special inspector a registered professional engineer?Zyes—no 'has <br /> 12. Hales and splits in steel tanks, if any, will be plugged with seif-tapping bolts, boiler plugs. water- <br /> tight, hydraulic cement, or welding. <br /> 13. Striker plates will be installed beneath all tank openings that could be used for manual dipsticking. <br /> �h n� h� C..o,.�,vc,..owr �u'f'�..rS• <br /> 14. -app Lining will be applied within 8 hours of sandblasting. <br /> 15. , Certification by coatings expert or special inspector that the tank was lined properly: <br /> a. Steel or clad USTs <br /> visual check of lining <br /> thickness test of lining <br /> hardness test of lining <br /> electrical resistance holiday detector test <br /> vacuum test <br /> b. Fib Iass UST's <br /> visual cher <br /> thickness test of lining <br /> �'�-� hardness test of lining <br /> .� vacuum test(not required if submerged by 50% of depth in ground water) <br /> 16. If a coatings expert was used, is he financially independent from the tank owner and lining <br /> company?_yes no <br /> 17. Tank integrity test will be conducted. <br /> �14�0'\ e'&N7- <br /> 18. A guideline has been submitted by the lining company for local agency inspectors to use when <br /> conducting a field inspection of the tank lining. <br />