Laserfiche WebLink
FEB 05 '99 14:45 FR CONTAINMENT SOLUTIONS814 542 W20 TO 9-15108958426 P.13/20 <br /> 01 <br /> section Safety <br /> bulletin <br /> date X2`!1/41 <br /> page 6 of 6 <br /> 11. Final Exit , <br /> Remove all equipment. Double check to ensure that all caps used to <br /> plug pipes are removed. Sign Entry Permit and include with the field <br /> trip report documents. <br /> Proaeduxe for External Work <br /> If the repair work involves cutting into a tank or grinding adjacent to a <br /> r aV3 It Sh shellwall, prior to any work the <br /> tank must be ventilated such that the vapor level is less than 10% LEI. <br /> initially and remains lower than 20% of the LEI. during work. Tanks that <br /> have been in service are to be continuously monitored to ensure these <br /> conditions are met. <br /> The above requirements must be met for field installation of fittings. <br /> a:saf3 <br /> f <br />