My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Fires may occur from sources of ignition. <br /> a) "Hot Work"procedures for all welding,cutting,and soldering operations: <br /> 1. All reasonably movable combustible materials should be removed from <br /> the Hot Work area and floors swept clean. Wood floors should <br /> preferably be covered by metal or wet down. <br /> 2. A fire extinguisher having a minimum rating of 2 A, 10 BC should be <br /> maintained nearby. <br /> 3. A fire watch should be maintained for at least 30 minutes after Hot <br /> Work operations are completed. <br /> E. If Contamination exposure is encountered on this project, activities will cease <br /> and proper notifications and procedures will be followed. <br /> 6. EXCLUDED WORK ZONE <br /> The boundary of the site shall be an excluded work zone. Personnel not actively involved in site <br /> work activities(other than inspectors from concerned regulatory agencies)shall not be allowed <br /> within the excluded work zone. <br /> 7. HAZARD COMMUNICATION <br /> All personnel are to be familiar with this Site Work Health and Safety Plan. <br /> Field supervisor will telephone for emergency service and notify office when needed. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.