My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment <br /> (Tank/Piping Removal) <br /> ON-SITE WORK <br /> FOR TANK/PIPING REMOVAL AND EXCAVATION <br /> $emoval of Flammable VanorB an &MQYAI of 1Uk s <br /> Removal of flammable vapors and removal of tanks will be performed in accordance with the <br /> requirements of Local Regulatory Agencies. The following are general guide lines. <br /> A review of available codes, standards, and recommended procedures produces the following <br /> consensus: <br /> A. All possible sources of ignition must be kept from impacting the tank or the area in <br /> which flammable vapors may reside during excavation or after removal. <br /> B. Drain and flush all piping into tank. Flammable or combustible free standing liquid <br /> production stock will be removed from the tank prior to removal. Avoid spilling <br /> product on the ground during disconnection of the tank from its associated lines. <br /> C. - Vent lines should not be sealed and should.be cut last. Keep all sources of ignition <br /> away from vent lines as well as tanks. <br /> D. Once all liquid has been removed from the tank, any tank with flammable vapors in <br /> excess of 10% of the LEL or S% oxygen will be purged with dry ice (CO). Thirty <br /> pounds of dry ice per 1,000 gallons of tank capacity is added to render the tank <br /> inert. All piping except the vent pipe should be disconnected. <br /> •• mereencv Services <br /> The address and telephone number of the local hospital, ambulance and medical emergency room <br /> should be prominently posted. In addition, the telephone number of the fire department/rescue <br /> unit should be posted. <br /> General information regarding emergency services may be found on front page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.