Laserfiche WebLink
Single wall pressurized lines cannot be left in place unless they were put in under a <br /> permit from the EHD. If these lines were not installed under permit and inspection,the <br /> lines must be verified to have been properly installed by uncovering and inspection of the <br /> lines by a special inspector and this inspection observed by EHD staff. Sampling of the <br /> line area will also be required in order to determined if any unauthorized release has <br /> occurred. Sampling is required and must be completed under EHD permit. (CCR Title <br /> 23 section 2660 (1) (k)) <br /> Any tank and line monitoring system to be proposed must be found listed in LG113#, <br /> and must meet the requirements of CCR Title 23 section 2666. This monitoring system <br /> must also provide pump shutdown upon leak detection. Per CCR Title 23 section 2660 <br /> (n) which refers to CCR Title 23 section 2635 (2A) (213) will apply to any corrosion <br /> protection system. <br /> Dispenser pans are required if any work is done to the piping and dispenser systems. <br /> If you have any questions regarding this matter,please contact me at(209)468-3446. <br /> Karen Furst, M.D., M.P.H. <br /> Health Officer ` <br /> Doug Wilson, Supervising R.E.H.S. <br /> Environmental Health Division <br /> D W/dw <br />