My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID : MAR 16 '99 10 : 16 No .001 P .02 <br /> N12NITORING ANU RESPOnEPLAN-X (Sjm*%� <br /> AR PRUDUCT$COMPANY IF ULITY IT <br /> SECONDA Y CONTAM"I'll""' <br /> NDF,RGROM RAGFTANK <br /> U D STO US &PRODUCT LINES WITH <br /> YJ <br /> ARCO Facility: -3.6v5$ Address <br /> This plan is designed to meet the monitoring and res orris rcqu ireml of Section 2632' <br /> Article 3,Tide 23. CCR. <br /> Secondarily contained storage tanks and lines at this facility am monitored by a continuous <br /> electronic leak detection system which consists of an alarm panel, sensors and associated <br /> clectroll Liquid seaAt ail int annular space of each double wall <br /> proct line ipin <br /> tank and <br /> rr'. ;a 'sensor detects the presence of a liquid there is both a <br /> dupg sun. enve <br /> visual and audible 1arm at the control panel, In addition,# e continuous monitor on the ProdUct <br /> piping"an willshut down the pump and activate the alarm qffltem when a release is detected <br /> or if the continuous product piping monitoring system fails or is disconnected, the pumping <br /> system mill shut down. <br /> Automatic l® leak detectors are installed on the secondarily contained pressurized product <br /> pipin& The fine leak detector will detect a loss of pressure int product lines and restrict the <br /> flow of produa <br /> UIPMEN <br /> AIAMENAANIC�!`!Ll F E <br /> IMObfiEQ_ <br /> ild U& III&OLHOM -1:1 M— <br /> The continuous electronic leak detection system including line leak et to beinspected <br /> according to the manufwurees instructions by an outside contractor once during elach calendar <br /> year- <br /> 3. ROUTINE ONUORING PROCEDURE <br /> 3w--- <br /> On a daily is the facility operator shall: <br /> A. inspect the control panel fbr visual and audible alarm signals to co nf=that the unk <br /> is operating. <br />
The URL can be used to link to this page
Your browser does not support the video tag.