Laserfiche WebLink
ID : MAR 16 '99 10 : 16 No .001 P .02 <br /> N12NITORING ANU RESPOnEPLAN-X (Sjm*%� <br /> AR PRUDUCT$COMPANY IF ULITY IT <br /> SECONDA Y CONTAM"I'll""' <br /> NDF,RGROM RAGFTANK <br /> U D STO US &PRODUCT LINES WITH <br /> YJ <br /> ARCO Facility: -3.6v5$ Address <br /> This plan is designed to meet the monitoring and res orris rcqu ireml of Section 2632' <br /> Article 3,Tide 23. CCR. <br /> Secondarily contained storage tanks and lines at this facility am monitored by a continuous <br /> electronic leak detection system which consists of an alarm panel, sensors and associated <br /> clectroll Liquid seaAt ail int annular space of each double wall <br /> proct line ipin <br /> tank and <br /> rr'. ;a 'sensor detects the presence of a liquid there is both a <br /> dupg sun. enve <br /> visual and audible 1arm at the control panel, In addition,# e continuous monitor on the ProdUct <br /> piping"an willshut down the pump and activate the alarm qffltem when a release is detected <br /> or if the continuous product piping monitoring system fails or is disconnected, the pumping <br /> system mill shut down. <br /> Automatic l® leak detectors are installed on the secondarily contained pressurized product <br /> pipin& The fine leak detector will detect a loss of pressure int product lines and restrict the <br /> flow of produa <br /> UIPMEN <br /> AIAMENAANIC�!`!Ll F E <br /> IMObfiEQ_ <br /> ild U& III&OLHOM -1:1 M— <br /> The continuous electronic leak detection system including line leak et to beinspected <br /> according to the manufwurees instructions by an outside contractor once during elach calendar <br /> year- <br /> 3. ROUTINE ONUORING PROCEDURE <br /> 3w--- <br /> On a daily is the facility operator shall: <br /> A. inspect the control panel fbr visual and audible alarm signals to co nf=that the unk <br /> is operating. <br />