Laserfiche WebLink
How to,. <br /> Take tank level measurements <br /> Read dispenser meters <br /> Tnspect equipment <br /> Recognize warning signs: dispenser hesitations, meter spins and odors <br /> - Manually close dispenser impact valve <br /> - Replace dispenser filters <br /> - Shut down the system with and location of. ARCOMatic Switch, electrical panel <br /> breakers, and emergency shut off switch <br /> ® Test the electronic monitor <br /> 6. MjQQBR&$UKNT1ON <br /> Written records of all monitoring,testing, and maintenance performed shall be maintained site or off-site at a readily available location fora period of at least 5 years. These records must <br /> be made available,upon request within 36 hours,tete local agency or the Board. <br /> 7. <br /> _Mana <br /> ZLr oaD <br /> Name Title <br /> ARCO Maintenance 1-800-ARCO-FIX(272-6349) <br /> Name Title <br /> 9. <br /> Tanks, %it Claa kwr.-In-s ISO <br /> Lines: <br /> a® <br /> to, L&CATIO-- GWILL <br /> Monitoring w9l be performed in the rear service area of the,statioN not accessible to customers- <br /> see attached Plot Plan. <br />