My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/12/99 16:32 FAX 425 251 8782 BARGRAUSEN Q023/029 <br /> wdem vedM.Mpory <br /> FABRICATORS OF METAL PROOMTS <br /> CAQ:E I QN NA�. - 30 : MLgFjTNp.§S TESFil S . IT IS Tllr= <br /> ,1�1 TING�N QUI MENT <br /> RESPONSIBILITY OF THS OWNER To PROVIDE THE FOLLOWING TESTS <br /> PRIOR TO COVERING THE TANKCS . 1 <br /> - SECONDARY CONTAINMENT TANKS 4TYPE I AND <br /> 11 ) SHALL HAVE THE PRIMARY ( INNER ) TANK TESTED ACCORDING TO <br /> 2- 8 . 3 AND THE INTERSTITIAL SPACE (ANNULVS ) TESTED USING . . . OR <br /> VACUUM AT 5 . 3 IN . HG . THE . . . VACUUM SHALL BE HELD FOR ONE <br /> VACUUM - HOUR . CARE SHALL BE TAKEN TO ENSURE THAT THE <br /> INTERSTITIAL SPACE IS NOT OVERPRESSURED OR SUBJECTED TO <br /> EXCESSIVE VACUUM . - <br /> N-I.F . P . A . -3o : 2-8 . -4 : - BEFORE THE TANK IS INTIALLY PLACED IN <br /> SERVICE . ALL LEAKSi- SHALL BE CORRECTED IN AN ACCEPTABLE MANNER . - <br /> N . F . P . A . -31 - STANDARD FOR INSTALLATION OF OIL BURNING EOUIPMENT . - <br /> jjQjl !ES I -Z E I lj��19 <br /> -.L—FOR LISIST-ALLATIC11"JI 7lip IN STA <br /> AL CeT <br /> 9 . THE EXCAVATED OPENING FOR INSTALLATION OF UNDERGROUND TANK(S) SHALL BE <br /> SUITABLY EXCAVATED tREFER TO OSHA. STATE. OR LOCAL CODES GOVERNINO <br /> OPEmimGs. ) LEVELED AND BACKFILLED PER THE FOLLOWING INSTRUCTIONS . <br /> 2 REFER TO THE , -FINISHING INSTRUCTIONS- FOR SPECIAL REOUIRtIENTS PRIOR TO <br /> OIAL OF -M.&�LT�Eg R_® TANKS . <br /> TANKS SHALL BE CC}MPL.ETLII EMPTY DURING HANDL.ING OR INSTALLATION TO PREVENT <br /> UNDUE STRE55 To THE TANKI[ S. ) <br /> 4. IN THE EVENT A TANK 23UMM BE INSTALI-ED. FILLED WITH PRODUCTS . PRIOR TO <br /> BACKIFILLING. THE LIOUID LEVEL WITHIN THE TANK SHALL NOT EXCEED THE COMPACTED <br /> BACKFILL LEVEL. <br /> nqjg:b: THE FOUNDATION FOR UNDERGROUND TANK(III) <br /> COWRIETE. ASHPAL-T. SHALL BE A MINIMUM OF S' CLEAN <br /> OR C0PJPACTW0 SOIL COMPACTED SAND. OR 0' OF 314' PEA <br /> GRAVEL. <br /> NOTE-811' TANKCSO INSTALLED IN AN AREA THAT is <br /> SUBJECT To HEAVY VEHICULAR TRAFFIC <br /> gh SHALL HAVE A PROTIECTIVE COVER OF la' <br /> CLEAN COMPACTED SOIL WITH EITHER 0- <br /> w w OF REINFORCED CONCRETE. OR a, OF <br /> 43ASPMALT PAVING. IF COMPACTED SOIL 13 <br /> TO BE THE ONLY COVER IT SHALL 96 A <br /> MINIMUM OF 36- DEEP. <br /> MOTE-02- TANK(SD INSTALLED IN AN AREA NOT <br /> SUBJECT TO HEAVY VEMICULAR TRAFFIC <br /> SHALL BE PROTECTED WITH EITHER 24' OF <br /> CLEAN COMPACTED SOIL COVERED BY 4' <br /> THICK REINFORCED CONCRETE OR 5- THICK <br /> _QffQp_v_ SE=T I ON QF X VAT I C*4 ASPHALT PAVING- <br /> To,C I <br /> oa_ rn®SrncMPHIMUM OF <br /> 62' FROM THE OUTSIDE EDGE OF TANK To <br /> THE INSIDE EDGE OF THE EXCAVATED <br /> OPENING. <br /> c <br /> NOTE-S2: MULTIPLE TANK INSTAL AT ION: SAME EDGE <br /> DISTANCES AS SINGLE TANK INSTALLATION, <br /> AND A MINIMUM OF 12' FROM OUTSIDE <br /> EDGE OF THE TANKS . <br /> E!OTG-01- THE MINIMUM DISTANCE FROM THE OUTSIDE <br /> ENDS OF THE TANKISI TO THE INSIDE EDGE <br /> NOTE C2 NOTIE D OF THE OPENING SHALL BE A MINIMUM OF <br /> PLAN AT ALJI_TIMSE TANK INSTAL12LATION <br /> PAGE I OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.