Laserfiche WebLink
03/12/99 16:32 FAX 425 251 8782 BARGRAUSEN Q023/029 <br /> wdem vedM.Mpory <br /> FABRICATORS OF METAL PROOMTS <br /> CAQ:E I QN NA�. - 30 : MLgFjTNp.§S TESFil S . IT IS Tllr= <br /> ,1�1 TING�N QUI MENT <br /> RESPONSIBILITY OF THS OWNER To PROVIDE THE FOLLOWING TESTS <br /> PRIOR TO COVERING THE TANKCS . 1 <br /> - SECONDARY CONTAINMENT TANKS 4TYPE I AND <br /> 11 ) SHALL HAVE THE PRIMARY ( INNER ) TANK TESTED ACCORDING TO <br /> 2- 8 . 3 AND THE INTERSTITIAL SPACE (ANNULVS ) TESTED USING . . . OR <br /> VACUUM AT 5 . 3 IN . HG . THE . . . VACUUM SHALL BE HELD FOR ONE <br /> VACUUM - HOUR . CARE SHALL BE TAKEN TO ENSURE THAT THE <br /> INTERSTITIAL SPACE IS NOT OVERPRESSURED OR SUBJECTED TO <br /> EXCESSIVE VACUUM . - <br /> N-I.F . P . A . -3o : 2-8 . -4 : - BEFORE THE TANK IS INTIALLY PLACED IN <br /> SERVICE . ALL LEAKSi- SHALL BE CORRECTED IN AN ACCEPTABLE MANNER . - <br /> N . F . P . A . -31 - STANDARD FOR INSTALLATION OF OIL BURNING EOUIPMENT . - <br /> jjQjl !ES I -Z E I lj��19 <br /> -.L—FOR LISIST-ALLATIC11"JI 7lip IN STA <br /> AL CeT <br /> 9 . THE EXCAVATED OPENING FOR INSTALLATION OF UNDERGROUND TANK(S) SHALL BE <br /> SUITABLY EXCAVATED tREFER TO OSHA. STATE. OR LOCAL CODES GOVERNINO <br /> OPEmimGs. ) LEVELED AND BACKFILLED PER THE FOLLOWING INSTRUCTIONS . <br /> 2 REFER TO THE , -FINISHING INSTRUCTIONS- FOR SPECIAL REOUIRtIENTS PRIOR TO <br /> OIAL OF -M.&�LT�Eg R_® TANKS . <br /> TANKS SHALL BE CC}MPL.ETLII EMPTY DURING HANDL.ING OR INSTALLATION TO PREVENT <br /> UNDUE STRE55 To THE TANKI[ S. ) <br /> 4. IN THE EVENT A TANK 23UMM BE INSTALI-ED. FILLED WITH PRODUCTS . PRIOR TO <br /> BACKIFILLING. THE LIOUID LEVEL WITHIN THE TANK SHALL NOT EXCEED THE COMPACTED <br /> BACKFILL LEVEL. <br /> nqjg:b: THE FOUNDATION FOR UNDERGROUND TANK(III) <br /> COWRIETE. ASHPAL-T. SHALL BE A MINIMUM OF S' CLEAN <br /> OR C0PJPACTW0 SOIL COMPACTED SAND. OR 0' OF 314' PEA <br /> GRAVEL. <br /> NOTE-811' TANKCSO INSTALLED IN AN AREA THAT is <br /> SUBJECT To HEAVY VEHICULAR TRAFFIC <br /> gh SHALL HAVE A PROTIECTIVE COVER OF la' <br /> CLEAN COMPACTED SOIL WITH EITHER 0- <br /> w w OF REINFORCED CONCRETE. OR a, OF <br /> 43ASPMALT PAVING. IF COMPACTED SOIL 13 <br /> TO BE THE ONLY COVER IT SHALL 96 A <br /> MINIMUM OF 36- DEEP. <br /> MOTE-02- TANK(SD INSTALLED IN AN AREA NOT <br /> SUBJECT TO HEAVY VEMICULAR TRAFFIC <br /> SHALL BE PROTECTED WITH EITHER 24' OF <br /> CLEAN COMPACTED SOIL COVERED BY 4' <br /> THICK REINFORCED CONCRETE OR 5- THICK <br /> _QffQp_v_ SE=T I ON QF X VAT I C*4 ASPHALT PAVING- <br /> To,C I <br /> oa_ rn®SrncMPHIMUM OF <br /> 62' FROM THE OUTSIDE EDGE OF TANK To <br /> THE INSIDE EDGE OF THE EXCAVATED <br /> OPENING. <br /> c <br /> NOTE-S2: MULTIPLE TANK INSTAL AT ION: SAME EDGE <br /> DISTANCES AS SINGLE TANK INSTALLATION, <br /> AND A MINIMUM OF 12' FROM OUTSIDE <br /> EDGE OF THE TANKS . <br /> E!OTG-01- THE MINIMUM DISTANCE FROM THE OUTSIDE <br /> ENDS OF THE TANKISI TO THE INSIDE EDGE <br /> NOTE C2 NOTIE D OF THE OPENING SHALL BE A MINIMUM OF <br /> PLAN AT ALJI_TIMSE TANK INSTAL12LATION <br /> PAGE I OF 2 <br />