My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14A(j <br /> le,& � M A R i � CIVIL ENGINEERING,LAND PLANNING,SURVEYING <br /> t4L,QTH <br /> PERIA l/SERVIC S' March 14, 2008 <br /> 0 <br /> E STANDARD FEDERAL EXPRESS <br /> "N,ENGiloo-11-1 <br /> Linda Trickett <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton CA 95202 <br /> RE: UST Retrofit Permit Application <br /> EVR Phase 11 Upgrade <br /> ARCO Retail Fueling Facility <br /> 2908 Benjamin Holt Drive, Stockton, California <br /> BP Fac. No. 2133/Our Job No. 13380 <br /> Dear Linda: <br /> On behalf of our client, BP West Coast Products, LLC, Barghausen Consulting Engineers, Inc., <br /> respectfully requests that the San Joaquin County Environmental Health Department review and approve <br /> the Underground Storage Tank Retrofit Permit Application for the EVR Phase 11 equipment upgrade to be <br /> completed at the existing ARCO fueling facility referenced above. <br /> Please be aware that the installation of the Healy Clean Air Separator (CAS) is mandated by the State of <br /> California Air Resources Board (CARB) and the San Joaquin Valley Air Pollution Control District <br /> (SJVAPCD). The CARB and the SJVAPCD require that this equipment be installed and operational by <br /> 2009. BP is submitting this application at this time to ensure that there is sufficient time to complete the <br /> installation prior to the CARB-imposed deadline. <br /> The scope of this installation includes the following: <br /> 1. Install a Healy CAS unit. <br /> 2. Install In-Station Diagnostics (ISD) in each dispenser. <br /> 3. Retrofit existing gasoline dispensers with EVR Phase 11 vapor recovery equipment <br /> For additional details, please see the notes on Sheet T-1. <br /> Enclosed for your review and approval are the following: <br /> 1. Two (2) copies of the signed UST Retrofit Permit Application <br /> 2. Two(2) sets of wet-signed plans <br /> 3. One (1) Barghausen Consulting Engineers, Inc., check in the amount of$294.00 for the plan <br /> check review fees <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES * OLYMPIA,WA 4 TACOMA,WA * SACRAMENTO,CA + TEMECULA,CA <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.