My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C F <br /> INSTALLATION INSTRUCTIONS for <br /> HEALY SYSTEMS, INC. <br /> CLEANI <br /> The Model 9942, Healy Systems Clean Air Separator Installation consists of a 400 <br /> gallon steel tank assembly(9961) that contains a fuel resistant bladder to contain <br /> excess gasoline vapors that may develop in gasoline storage tanks during idle <br /> periods of.gasoline dispensing facility operation. The tank assembly weighs <br /> approximately 800 pounds which makes it necessary to have a power assisted <br /> lifting device available at the installation site to remove the tank from the <br /> transportation vehicle and place It on the required concrete pad (see drawing 9900- <br /> 9945). The pad (level within 1/8"/foot) is located in close proximity to the storage <br /> tank vent lines. The pad is a requirement of this installation. DO NOT PLACE THE <br /> TANK DIRECTLY ON THE GROUND OR ASPHALT SURFACE. NOTICE: The installer <br /> is responsible to assure that the Installation meets the latest edition requirements of <br /> NFPA 30 and NFPA 30A. No electrical connections are required. The tank <br /> securement method shown in 9900-9945 shall be approved by the local authority <br /> having jurisdiction with respect to wind and seismic loading. <br /> In addition to the tank, there Is a hardware kit that contains the following: <br /> 1 Healy Model HPVV or UL Approved Pressure/Vacuum vent valve <br /> 4 Locking 1" NPT Ball Valves <br /> 4 Pad locks (keyed alike) <br /> 1 Breather Assembly, Healy Model 9948 <br /> 1 Vapor Inlet Assembly, Healy Model 9956 <br /> 1 Float Check Valve Assembly, Model 9466G <br /> Reference Healy Systems Installation drawing 9900-9942 for placement of the above <br /> parts. The local contractor is responsible to provide all necessary, galvanized <br /> piping, non-hardening, UL classified pipe joint compound and plumbing fittings. <br /> The tank arrives at the site assembled and tested. All plumbing should be done <br /> using galvanized steel pipe (Schedule 40) and approved nipples. Mounting <br /> hardware should be galvanized or stainless steel. Careful attention must be paid to <br /> the Installation drawing C9900-9942 to assure proper operation of the bladder <br /> system. The bladder assembly need not be initially inflated after installation. <br /> It is important that the tank be secured to the concrete pad as shown on the diagram <br /> to prevent any unintentional repositioning of the tank as the connecting plumbing to <br /> the vent system is accomplished. <br /> CAS 7/04 cg <br />
The URL can be used to link to this page
Your browser does not support the video tag.