My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN ® 2,CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALLUSTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> FACILITY ID#(Agency Use Only) l <br /> BUSINESS NAME(Same as FACILITY NAME)ARCO 02133 3' <br /> BUSINESS SITE ADDRESS 2908 BENJAMIN HOLT DR 90.3' CITY STOCKTON 104' <br /> .II.EQUIPMENT TESTING AIyID P�tEVENTIVE MAWTENANCE ; <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be perfomied by qualified personnel. <br /> (23 CCR§2632,2634,2638,2641)-......................_........._.». ...»._. . .......... .__ .. - ».........................._.. ........ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 4990.3b <br /> 7. <br /> III IYIQ.NITORING;I.®CATIQNS <br /> ®1.NE IV SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN, ❑2.SITE PLOT PLAWMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TAW MONITORING=IS PERFO t34I£D USII�TG TH ;FOLLOWTi�TG M1aTHUll(S} . <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490 5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARIMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT 1S: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 494.6 <br /> »....»..»...................•••......»._:...«....._...�.-...»......_.._... .._..._..- »......_49Q7. ...... <br /> -_-_---- - 4908 <br /> PANEL MANUFACTURER: VEEDER ROOT MODEL#: TLS-350 <br /> LEAK SENSOR MANUFACTURER: VEEDER ROOT MODEL#s 794380-420 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-II <br /> PANELMANUFACTURER: 440-12- MODEL#: 490.13 <br /> -...-........- _ ,-.._-.___.._._._.._-.--._...»._-.... .............•---._._......................... .......................... ... -.._.... ...._....._._........_. <br /> IN-TANKPROBL MANUFACTURER: 44014' MODEL#(S): 490•Es <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑ b.DAILYMIGHTLY ❑ 0.1VEEKLY 490•E6 <br /> ❑ d.MONTHLY ❑ e.OTHER S ecif 490-17 <br /> .-.•--.•.------•-----------•---------._.__---•--• _.._._...»...___......_............... .........»..».........».. .E.....Y).._......»........».......... ......»__... •----- <br /> PROGRAMMED TESTS: Ela.0.1 g.p.h. ❑ b,0.2 g.p.h. ❑ c.OTHER(Specify)• 4W19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY RIANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS El b.60HOURS 490-21 <br /> 490-2z <br /> EF 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490.24 <br /> TEST FRE <br /> Q P�Y): 440-25 <br /> ❑99.OTHER (Specify): 490-27 <br /> V ]PJ['lu MONITEJ]tING IS" 'ERFOI[MEDiJSG.THE Y?0 <br /> 4 <br /> 0 <br /> 1�VINCr 1V�ETlEiOD{S)(Oheck all that apl?�} <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT'WITH AUDIBLE AND 4M28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> .__......................._...----,--•--...._...`....._.__._.-- - -- ... - _.._..... .....»_._.. .._._..._--..---..__-..__...____.___...-------•------•-•-• <br /> PANELA4ANUFACTURIR•VEEDERROOT 4` 30 MODEL#: TLS-350 490.31 <br /> _,.; _.._.._..---•-----•...•-•_.__.».....».._._. .....OD ..__...._.._» .._... ...__ __.. <br /> LEAK SENSOR MANUFACTURER: VE E, ROOT MODEL#(S)µ794380-323_ __.__...._____. <br /> •••-49.1.32 <br /> ....__._..............-........._____...._-_«...__..._.....».__._______....__..__.._.._........»_.........».......».. -_ .. .. 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> N 2.AIECHANICAL LINE LEAK DETECTOR(AILLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> -PRODUCT FLOW WHEN A LEAK IS DETECTED;23 CCR j2636)_•__»_ 490-36 <br /> MLLDMANUFACTURER(S)•VAPORLESS(VMI);PREMIUM TANK 49107 MODEL#(S)• LD2000(PREM.) 490.39 <br /> ® 3.ELECTRONIC LME LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS(23 CCR§2636) 490.39 <br /> ELLD MANUFACTURERS)VEEDER ROOT °90 4°_ MODEL#(S): PLLD(8484) 490 41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 h 2•MINIMUM ANNUAL 0.1 g.p.h. <br /> g p. . ❑ 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-43 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490.44 <br /> 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FRE UENCY ❑ a.ANNUALLY Q b.EVERY 3 YEARS ❑ c.OTHER(S if) 490-46490.47 <br /> S.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIMESYSTENI OPERATED* 490.49 <br /> •Allowed f""nitarinj of unbidedenwgewy genernor fuel mal HSC§25281.5(bX3) <br /> ❑ 6.SUCTION PIPING REEETS EXEMPTION CRITERIA[23 CCR§2636(x)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49831 <br /> ❑ <br /> 99.OTHER(Specify) 490-52 <br /> 490.53 <br /> Arco 02133,BelsWre Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.