Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> STT �•� g�y[� p�7�(�ry.D�f/�A7 •} �,� /y'�rg �,{ 7� �r. �'�y��/•� <br /> ... Tae UNDER DISPENSER Vo/1lTH1NiT 5�:I��\aT+!C)FTwOi7A®Avtt 47 - <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-s4a <br /> WI <br /> d40-Sah <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify) <br /> ... ._._......_... _.............-............ ..-...1moDuLN(s)-794380-323 <br /> .........—.._._...——---------..................... <br /> -... <br /> PANEL MANUFACTURER:VEEDER ROOT 49ass MODEL#:TLS-350 49<!-s6. <br /> LEAK SENSOR MANUFACTURER:VEEDER ROOT 490 s7 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ® a.YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 440.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER, ® a YES ❑b.NO 4962 <br /> 2.UDC CONSTRUCTION IS ®1.SINOLE-WALLED ❑2.DOUBLE-WALLED 49x63 <br /> IF DOUBLE SVALLED: 49ab4a <br /> -UDC INTERSTITIAL SPACE IS MONITORED BY: l:LIQUID p 2.PRESSURE ❑3.VACUUM <br /> ._._ MONITORED _�... .......a._......_._._ ....................................­•------...........__.... <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a,YES ❑b.NO 4�6rh <br /> �YI PEI,tIODIC;SYSTEIVI TESTYNCx <br /> 1.ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THATENHANCED 4W63- <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR(2644,1?— <br /> _.._. a Win_ ._M..._..__. ..._ _...._._.......»................. ._.... ._._........ <br /> 02.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 0-94.66 <br /> 0-j................................. - ---------------------_--_----_-_--______..---__---.-__--______-.--_---.------_-.---------------•-----•----_---_-__--.--_-----•••••-•-•--••---•--.SPILL BUCKETS ARE TESTED ANNUALLY. 590.67 <br /> vlu:RcoltDlcEE�INc <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-683 ❑Visual Inspection Records 44o-6sb ❑Tank integrity testing results 490-69c <br /> ❑SIR testing results(and supporting documentation records). 44a68d ❑ Tank gauging results(and supporting documentation records). 494.68e <br /> ❑ATO Testing results(and supporting documentation records).4"f ❑ Corrasion Protection 60-day logs 4go-ass <br /> ®Equipment maintenance and calibration records. 490- <br /> IX TiIAINITG <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.6% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY0(Chock all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)494-69h <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69¢ <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.690- <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'49&69t <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69$ <br /> ❑ OTHER(Specify):u69b,moi <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC), <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but Is not limited to,the following: <br /> Y Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> D Names of contact person(s)for emergencies and monitoring alarm,490-70 <br /> : <br /> x cQ �rs�Ab�iT><ox�� rivI?o�,ivt�;TroN , <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49o•7t <br /> *Monitoring systems manually maintained by contracted,licensed pump and tank technicians.Best Management Practices <br /> are maintained in the H.S.S.E.Retail Facility Programs Manual(Green Binder). VAPOR POT SUMP MONITORED BY <br /> VEEDER ROOT 794380-323&794380.420 SENSORS. <br /> 1% NNEL'RESPON ][.ITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that Indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME BP WEST COAST PRODUCTS LLC 494.72 TITLE COMPLIANCE DEPARTMENT 49x73 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII,OW WR/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of My knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490-77 <br /> eWl <br /> 1N n�15 t f �1 <br /> APPLICANT NAME(print): 494.79 APPLICANT TITLE: 490-79 <br /> RICHARD GOSSETT FOR JOSEPH BOOKOUT ENVIRONMENTAL COMPLIANCE <br /> SPECIALIST <br /> Arco 02133,Belshire Environmental Services <br />