Laserfiche WebLink
bp Emergency Shut-Off (ESO) Testing Results & Checklist <br /> it i <br /> Facility Information Contractor Information Test Results <br /> Site# 2133 Co.Name: FASTECH Date: 02/24/12 <br /> Addr. 12908 Benjamin Holt Dr. Phone. 714-523-0194 <br /> Ci /St:IStockton CA Lead Tech: Isaac Anderson Alltech Petro Inc. X PASS <br /> eMaint.W.O.# Name: or <br /> Pass ort#: FAIL(Next Day Repair Required) <br /> Signature: <br /> The objective of this test is to provide assurance that when the ESO switch is activl6fd,al.44ueling system circuits(turbines,and dispensers)are de-energized,and <br /> remain de-energized until they are reset manually. The test procedures and guidelines shall be in accordance with the ESO Testing Process. <br /> # The following information is to be completed. X To SelectYes No N/A <br /> SITE DATA <br /> 1 Number of ESO switches: 1 <br /> 2 Type of Switch Push Pull Monentary X Plain IighUToggle Other: <br /> if Momentary type,locate and identify re-set button <br /> 3 Type of Turbine Control Relay System(Electrical Distribution Center): <br /> Brown BoxI Power Solution Custom Fabricated Carolina Box 10ther <br /> 4 Type of Turbine Control Relays: I Make Red Jacket Model lCapacitor kn Control Box <br /> 5 Type of Line Leak Detection: I Imechanical ELD/CPT IPI LD X <br /> 77777-7 PERFORMANCE TEST <br /> 5 Does the ESO shutdown power tote X <br /> Does the ESO shutdown power tote X <br /> Is the 220 voltage tote turbine relay remove (either the line side or the motor side of the contacts or t e Fcojlp X <br /> 8 <br /> 9 Are the DISPENSER BREAKERS clearly i enti ielabeled? X <br /> 10 rete TURBINE BREAKERS clearly i enti ielabeled? X <br /> 11 re all the ESOs accessible and clearly i enti ielabeled? X <br /> Did the s unction correctly(de-energized from either the line si a or the motor side of the contacts or the coil)? X <br /> 12 <br /> If#12 is NO,briefly describe what was wrong: <br /> 12A <br /> How was it corrected: <br /> 12B <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the Site <br /> Manager of the problem,place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate circuit panel, <br /> iclearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint W.O.Ticket# <br /> 11 Site's fueling system is fully operational. X <br /> 12 All equipment secured and any access ports,lids,enclosures are closed. X <br /> 13 All safety barricades,and any debris was been removed. X <br /> COMMENTS <br /> Submit completed copy with other documentation in E-Maintenance. <br />