My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />San Joaquin County <br />Environmental Health Department DIRECTOR <br />600 East Main Street Donna Heran, REHS <br />Stockton, California 95202-3029 PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Website: www.sigov.org/ehd Kasey Foley, REHS <br />Phone: (209) 468-3420 <br />Fax: (209) 464-3433 <br />APPLICATION FOR UNDERGROUND STORAGE TANK <br />RETROFIT OR PIPING REPAIR PERMIT <br />[ ] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br />applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location of <br />the tanks(s), piping, all tank -related appurtenances, streets, adjacent properties (north toward the top of the page), <br />nearby septic tanks, leachfields, water wells, buildings, underground public utility lines (including water, sanitary <br />sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are not included <br />on the site map, you must state in writing that USA Dig will be contacted prior to excavation activities. <br />[ ] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br />REPAIR PERMIT". NOTE: If sampling is required, sampling firm shall be an independent third party from the <br />contractor performing the work. <br />[ ] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br />OWNER/OPERATOR of the facility. <br />[ ] 5. Submit a completed "Service Request" form and "Underground Storage Tank Program Fee Worksheet". <br />[ ] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a "Backfill <br />Excavation Certificate" as required by the San Joaquin County Building Department. If a "Backfill Excavation <br />Certificate" is required by any incorporated areas (cities), submit to the appropriate City Building Departments, <br />pursuant to the Uniform Building Code STD 70-11. <br />[ ] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately completed plan. If <br />gross deficiencies are identified, an addendum will be required with a $125.00 per hour fee and the review will <br />begin on the date of resubmittal. <br />[ ] 8. Advance inspection notice of at least 48 hours is required by the Environmental Health <br />Department (EHD). <br />[ ] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br />atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), and barriers to <br />secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project manager's <br />responsibility for compliance with all health & safety regulations and requirements, including confined space <br />requirements, which shall be strictly adhered to at all times during the course of the underground storage tank <br />(UST) activities. <br />[ ] 10. The EHD permit shall be on site during all UST permit -related activities. <br />[ ] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any work <br />must be described in detail on pages 3 & 4 and be shown on the detailed site map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.