My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Qe►. A U <br />m 2 <br />Z 2 <br />s may, <br />G�r'ryG ENGIN4V <br />San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton CA 95202 <br />0 <br />CIVIL ENGINEERING, LAND PLANNING, SURVEYING, ENVIRONMENTAL SERVICES <br />October 20, 2011 <br />FEDERALEXPRESS <br />(209) 468-3420 <br />RE: UST Retrofit Permit Application <br />EVR Phase II Upgrade <br />ARCO Retail Fueling Facility <br />2908 Benjamin Holt Drive, Stockton, California <br />BP Fac. No. 2133 /Our Job No. 13380 <br />RECEIVE® <br />N"- r 21 2011 <br />ENVIRONMEN AL HEALTH <br />PERMIT/SFRVICES <br />On behalf of our client, BP West Coast Products, LLC, Barghausen Consulting Engineers, Inc., <br />respectfully requests that the San Joaquin County Environmental Health Department review and approve <br />the Underground Storage Tank Retrofit Permit Application for the EVR Phase II equipment upgrade to be <br />completed at the ARCO fueling facility referenced above. <br />The scope of this installation includes the following: <br />1. Install a Healy CAS unit <br />2. Install In -Station Diagnostics (ISD) in each dispenser <br />3. Retrofit existing gasoline dispensers with EVR Phase II vapor recovery equipment <br />Enclosed for your review and approval are the following: <br />1. Three (3) copies of the signed Application for UST Retrofit Permit <br />2. Three (3) sets of wet -signed plans <br />3. Three (3) copies of manufacturers' specification sheet <br />4. One (1) Barghausen Consulting Engineers, Inc., check in the amount of $375 for the plan <br />check review fees <br />It is our understanding, based on conversations with your office, that these items comprise a complete <br />submittal package. Please do not hesitate to contact me at (425) 251-6222 if you require additional <br />materials for your review. Thank you for your prompt attention to this matter. <br />Respectfully, <br />M. Alexia Inigues <br />Project Planner <br />MAI/jss <br />13380c.015.doc <br />enc: As Noted <br />cc: Richard Gossett, BP West Coast Products, LLC <br />Scott Listar, BP West Coast Products, LLC <br />Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br />Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. <br />Omar Vasquez, Barghausen Consulting Engineers, Inc. <br />Angelo A. Bologna, Barghausen Consulting Engineers, Inc. <br />Peter B. Tobin, Barghausen Consulting Engineers, Inc. <br />18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX <br />BRANCH OFFICES ♦ OLYMPIA, WA ♦ TEMECULA, CA ♦ WALNUT CREEK, CA <br />www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.