My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:32:40 PM
Creation date
6/3/2020 9:44:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />San Joaquin County <br />Environmental Health Department <br />Attn: Garrett Backus -2- <br />d. penetration fittings for the secondary containment pipe listed above in c. <br />October 27, 2011 <br />RESPONSE: Cut Sheets are enclosed with this letter. The UL listing is #MH8432 - Smith <br />Fiberglass. <br />COMMENT: The suction copper line which connects the vapor pot to the turbine pump is not <br />currently in secondary containment. We require that the copper line be in secondary <br />containment piping. The piping will need penetration fittings installed in the transition <br />sump and the turbine sump. The secondary containment piping will slope back to the <br />turbine sump. <br />RESPONSE: Note was added to the site plan indicating the secondary <br />containment for the copper suction line. <br />CoMmENT.. Update the scope of work and plans to include these details and send the update to <br />my department. <br />RESPONSE: The plans have been revised in accordance to your comments. <br />Please do not hesitate to contact me at (425) 251-6222 or at ainigues@barghausen.com if you require <br />additional materials for your review. Thank you for your prompt attention to this matter. <br />Respectfully, <br />M. Alexia Inigues <br />Project Planner <br />MAI/jss <br />13380c.017.doc <br />enc: As Noted <br />cc: Richard Gossett, BP West Coast Products, LLC <br />Scott Listar, BP West Coast Products, LLC <br />Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br />Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. <br />Omar Vasquez, Barghausen Consulting Engineers, Inc. <br />Angelo A. Bologna, Barghausen Consulting Engineers, Inc. <br />Peter B. Tobin, Barghausen Consulting Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.