Laserfiche WebLink
by Emergency Shut-Off (ESO) Testing Results & Checklist <br />01 <br />z a <br />ow <br />--- - <br />IR F <br />�. <br />Site # 2133 Co. Name: FASTECH Date 04/05/11 <br />Addr. 2908 Ben amin Holt Phone: 714-5523-0194 <br />Ci /St: Stockton CA Lead Tech: Omar Ruiz PASS <br />eMaint. W.O. # 9749046 Name: Omar Ruiz or <br />Pass rt#: IB35686 FAIL (Next Day Repair Required) <br />Signature: — — The objective of this test is to provide assurance that when the ESO switch is activated, all the fueling system circuits (turbines, and dispensers) are de- <br />energized, and remain de-energized until they are reset manually. The test procedures and guidelines shall be in accordance with the ESO Testing Process. <br /># The following information is to be completed K To Select <br />Yes No N/ <br />i <br />1 Number of ESO switches: 1 <br />2 Type of Switch Push Pull ❑ Monentary OPlain light/Toggle ❑ Other. <br />if Momentary type, locate and identify re-set button): <br />3 Type of Turbine Control Relay System (Electrical Distribution Center): <br />Brown Box EJ Power Solution Custom Fabricated ❑ Carolina Box PlOther <br />4 Type of Turbine Control Relays: Make redJacket Mode constant <br />5 Type of Line Leak Detection: Mechanical ELD / CPT PLLD <br />�.�.., �3 <br />\ <br />6 Does the ESO shutdown power to the DISPENSERS? <br />7 Does the ESO shutdown power to the TURBINES? ❑ <br />Is the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the coil)? 0 ❑ <br />8 <br />9 Are the DISPENSER BREAKERS clearly identified / labeled? / <br />10 Are the TURBINE BREAKERS clearly identified / labeled? 0 ❑ <br />11 Are all the ESOs accessible and clearly identified / labeled? <br />Did the ESO(s) function correctly (de-energized from either the line side or the motor side of the contacts or the coil)? ❑ ❑ <br />12 J <br />If #12 is NO, brief describe what was wrong: <br />How was it corrected: <br />12B <br />12C If repair or ESO functionality cannot be corrected same day (prior to leaving the site). The technician MUST notify the <br />Site Manager of the problem, place an "Out of Service" Tag on the ESO(s), and identify an alternate mean (i.e., locate <br />circuit panel , learly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br />12D Elite Customer Solution Center has been contacted for the repair. <br />eMaint. W.O. Ticket # <br />11 Site's fueling system is fully operational. <br />12 All equipment secured and any access ports, lids, enclosures are closed. , <br />13 All safety barricades, and anx debris was been removed. <br />} <br />,,..,\ 5 <br />s3 � <br />Submit completed copy with other documentAtlon in E-Maintenance. <br />