Laserfiche WebLink
Estimated Tank Trim Delivery Date : <br /> COMPANY. Arrierican COnwL Develop DATE OF QUOTATION QUOTE NUMBER <br /> PROJECT Country Club Store 06(04109 w <br /> QUANTITY DESCRIPTION UNIT PRICE EXTENDED <br /> 1 Hirt Processor,NOT ISD compati6ii----- $ $ <br /> 4 VST VSTA-EVR-012 12"Coaxial EVR Whip Hose $ $ <br /> 4 VST VDV-EVR-096 8'Coaxial EVR Hose With Venturi $ $ <br /> 4 VST VST-EVR-SBK Coaxial EVR Breakaway With Check Valve $ $ <br /> 4 VST VST-EVR-NBBL Coaxial EVR Balance Nozzle Black $ $ <br /> I HUSKY 5886 T'Pressure Vacuum Vent(EVR Carb Approved)3 Required $ $ <br /> Fuel Surcharges-Many factories are now adding on fuel surcharges to cover the <br /> high cost of fuel.Currently GMmw and Gasboy have Irnplemented fuel <br /> surcharges. NWP expects many other factories to follow.NWP will have to pass <br /> these charges on.Please be aware that your final bill will Include any fuel <br /> surcharges that NWP has to pay. <br /> Above Specifications Exclude the Following(Unless Otherwise Noted): <br /> Plans,Permits,Inspection,All Testing,Labor to Assemble or Install,Miscellaneous <br /> Pipe Fittings and Accessories,Any Electrical Consideration,Offloading or Setting Any <br /> Equipment or Tank, Site Improvements, Guard Barriers, Any Other Items(s)Not <br /> Specifically Mentioned Above <br /> Equipment Only. No Installation.Subject to engineers approval. This quotation does <br /> not lwAde or imply arty equipment or quantities other than listed herein. Contractor to <br /> determine actual quantities required. No retainage to apply. <br /> Perforrnance: Performance of equipment listed is based upon the accuracy of the <br /> information supplied to NW Pump and Equipment Co.by the customer or customer's <br /> engineer.Guarantee of performance may require approval by a licensed engineer at <br /> the customer' <br /> Page 2 of 2 <br /> Northwest Pump Equipment Co. <br />