My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1856
>
2300 - Underground Storage Tank Program
>
PR0231069
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 4:51:25 PM
Creation date
6/3/2020 9:44:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231069
PE
2361
FACILITY_ID
FA0001909
FACILITY_NAME
STOP N SHOP
STREET_NUMBER
1856
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
123-191-02
CURRENT_STATUS
01
SITE_LOCATION
1856 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231069_1856 W COUNTRY CLUB_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w.tou0cri.ng System Certification <br />Site Address:Oate of'festing/Servicing: 8 <br />F. In -Tank Gauging / SIR Equipment: Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />ffC3No* <br />* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />No Were all tank gauging probes visually inspected for damage and residue buildup? <br />* Was accuracy of system product level readings tested? <br />* Was accuracy of system water level readings tested? <br />* Were all probes reinstalled properly? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these delicieneics were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Com tete the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipment cWtification, was a leak simulated to verify LLD performance? <br />❑ N/A (Check all that apply) Simulated leak rate: 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h.` <br />❑ Yes 113 No* I Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes ❑ No* Was the testing apparatus properly calibrated? <br />Ed <br />Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />13 Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes ❑ Alo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A or disconnected? <br />4YesObio* For electronic LLDs, does the turbineautomaticallyshut off if any portion of the m <br />N/A malfunctions or fails a test? <br />0* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Ef Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />4 In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />I. Comments: <br />system <br />
The URL can be used to link to this page
Your browser does not support the video tag.