Laserfiche WebLink
W <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />oil I <br />F AREAS BENEATH DISPENSERS) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) M40. <br />CONTINV )US ELECTRONIC MONITORING OF UNDER DISPENSER CONTAf4%4ENT(UDC) <br />PANE'. MANUFACTURER- M" MODEL M52. <br />LEAK ?ENSOR MANUFACTURER: M53 <br />MODEL #(S):® M54. <br />WILL )ETECTION OF A LEAK INTO THE UM TRIGGER AUDIBLE AND VISUAL ALARMS)MSS <br />WILL , UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUa. YES b NOTDOWN" 9 a. YES b. NO <br />M16 <br />�,DNNECTION OF UDC MONITORING SYSTEM TRIG(. -J -R AUTOMATIC PUMP SHUTDOWN? P a. YES b. NO 107 <br />VM4w <br />W <br />WILL 'AILUR <br />2 MECHAN"! 'AL ASSEMBLY (e.g.., FLOAT AIVAV ASSEMBLY) IN JfDc TR!, S SHEAR VALVE IN CASE OF LEAK <br />ASSEI BLY MANUFACTUR -- We MODEL #(S):_M19 <br />r,:-'3 VISUAL M )NITORING DONE. DAILY b. WEEKLY (Rmn,= a;j,cv rm. __ �j) W. <br />C 4 NO DISPE SERS <br />F_ 911. OTHER pecify) <br />"Pull M61, <br />I WE HAVE TEEN NOTIFIED By THE STATE WATER RESOURCES CONTROL 1r)ARD THAT WE MUST IMPLE <br />MENT ENHANCEMD LEA <br />Dr7ECTIC 4 (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §12°44 1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />7 7.7 �777 <br />DC-UMENTS MAINTAINED AT FACILITY (Check all _aMly) <br />1. THIS III JFRGROUND STORAGE TANK MONITORING PLAN (Required) <br />2, OPERA'; iNG MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Reqaired) <br />3 THE FA4 ILITY'S BEST MANAGEMENT PRACTICES (Required as of 711/20041 <br />4, CALIFO NIA UNDERGROUND STORAGE TANK REGULATIONS <br />5- CAI.IFO:LNLA UNDERGROUND STORAGE TANK LAW <br />6, _7 STATE 'i'ATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION "l-IANDBOOK FOR TANK OWNERS MANUAL AND <br />STATIST iCAL INVENTORY RECONCILIATION" <br />7. SWRCH 'UBLICATIOM 'WEEKLY MANUAL TANK GAUGING FOR SMALL !,`NDERGROUND STORAGE TANKS" <br />99 OTHER i,'-pecify): <br />Pe arnelwith US monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can Access those documents when n eded, <br />B,. ulna 1, 2004, th ; facility will have a "Designated UST Operator" who has passed the operm(,r exam administered by the International Code Council (ICC). By July <br />WI Pail, and armi- ly thereRflier, the "Desi-eiiated UST Operator" will wain facility employers in the proper operation and maintenance of the UST systems, This <br />.; Iniiwill incluo but is not limited to, the following: <br />Operation Of he UST Systems in a manner consistent with the facility's best managerner, I practices. <br />*rhe facility !nployce's role with regard to the leak detection equipment. <br />rhe facility mployee's role with regard to spills and overfills. <br />Whom to cc tact for emergencies and leak detection alarms. <br />Fo scility employ ts hired on or after July 1, 2004, the initial training will be conducted witht i 30 days of the date of hire. <br />Pit a ;ise this am in to include any additional UST monitoring -related information (e , additional information <br />required <br />qu" ed byy our local agency): MRS <br />C/00-1 VV) r <br />_;�S_ i 7/l/2004, 1 IE _`DtESIGNATED UST O—PERAIDENTIFIED IN SECTION Ill •* I KhURRENT UST OPERATIN4 PERMIT APPLICATION - <br />FA, LtTYFORM JILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MO'4TORING ACTIVITIES AND MAINTAINING LrAK DETECTION <br />EQ: 1F%ffiNT CO'- `-RED BY THIS PLAN. AND WILL PERFORM AND DOCUMENT M1'41MUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />US S'�'STEMS IN ACCORDANCE WITH 23 CCR § 2715 b). <br />IF C N: cuWtify that t 4ffF6MWi0R_EMvi49d herelit is truie and ac�-urate to the best of m know led e. <br />R S E REXIESENMIQ DATE: <br />n ( N01 <br />Owner m.90 <br />Operator <br />RAT, R NAME (pint): OWNEWOPERATOR TITLE: <br />1 1 OA— <br />(.Ig- f� Use Only) This plan hasbeenucknivMd and: moved 0 Ap -oved With Conditions Disa <br />moved <br />Lot: ARencySigw Date: <br />Cor milts/Special 1 inditiims• <br />SJC I HD (0-103) 3/4 <br />07/23/03 <br />