Laserfiche WebLink
Zcu ntry Club Food/" <br />417-0198 <br />Page two <br />3. Furnish & install all concrete & asphalt required for the new fuel <br />tank pads, plumbing & electrical trenches, new island forms and <br />dispenser pans. <br />6. Furnish and install the following equrment. <br />TASKS <br />1 12,000 gallon XERXES double wall fiberglass underground storage tank <br />split ( 2 ) cW <br />,&art/ynts with ttio (2) 42" col -lags standard openings. <br />5 <br />3 <br />TANK ACCESSORMS <br />2 OPW five gallon fill spills <br />2 OPW overfill prevention valves <br />2 OPW 41 fill caps a adaptors <br />2 OPW 4" vapor caps & adaptors <br />2 OPW 2" pressure vacuum vent caps <br />2 Western 42" x 48" fiberglass e bonding kits <br />2 Mechanical leak detectors <br />2 Teleflex SS flex hose 2" x 184 <br />12 Environ entry boots <br />TANK MONITORING SYBTEX <br />I OXTECconsole with printer <br />2 014NTEC mag. inventory probes <br />2 OMNTEC piping sump sensors <br />1 OFINTEC interstitial probe <br />I OWNTEC automatic shut down relay <br />MISC. <br />2 3711 watertight manways- (piping sumps) <br />3 16" steel manholes (interstitial space, inventory) <br />2 12" steel manholes (vapor, phase Y) <br />DISPENSER PANS, ISLAND FORK & ACCESSORIES <br />2 Bravo dispenser pan with bracket, L-apact valve, plumbing & electrical <br />penatration fittings <br />4 Teleflex SS flex hose 1-1/2" x 24" <br />4 3" x 30" containment hoses <br />2 Riverside steel island forms 41 x 81 x 13" <br />8 Steel bollard poles 4' x 71 <br />7. ST -27 and ST -30 air pollution testing. <br />S. Precision testing of tanks and piping. <br />TOTAL BID FOR SCOPES OF *Am & "Be: $114,027.00 <br />