Laserfiche WebLink
WRITI'EN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before malting the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name �` <br />i ��� ,—.- <br />c uta E') <br />I r t <br />- <br />Facility Address <br />A Describe the frequency of performing the monitoring: <br />Tank Wi tet_ ice.= ,l.A—.~: --- ) - n . —: „ _ <br />Piping �- ,� •=6 EL C) C' <br />-q, C rE 11 �`7r0.a-"SL 61/SC T11a�"'z <br />�C'e—�' ill .. � �Z:+!'-r�_ ;�'"'� i,c ' � ,L....`� `� � v r''' _ C.- `��:J� t..' �ti✓.: i <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank <br />C <br />0 <br />Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />List the name(s) and title(s) of the people responsfole for performing the monitoring <br />and/or maintaining the equipment. <br />E. Reporting format for monito g: <br />Tank VVTC <br />Pipe '1r s , <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: ic__ c�t��� i <<;tiI <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: <br />