My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1856
>
2300 - Underground Storage Tank Program
>
PR0231069
>
COMPLIANCE INFO_2002-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 4:51:25 PM
Creation date
6/3/2020 9:44:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2009
RECORD_ID
PR0231069
PE
2361
FACILITY_ID
FA0001909
FACILITY_NAME
STOP N SHOP
STREET_NUMBER
1856
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
123-191-02
CURRENT_STATUS
01
SITE_LOCATION
1856 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231069_1856 W COUNTRY CLUB_2002-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONDAP <br />'y pjpF TESrMG <br />5- SEEManufacturer <br />m <br />Test Method Developed by: other (Specify) <br />by: pressure, <br />Test Method Developed other (Specify) <br />RESSURE <br />GAUGE <br />bT.jC—mt Equipment Used: <br />f PIPIn_Run /E <br />Piping mater <br />Piping Manu cturer. <br />piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping run isolation, <br />Wait t -,m,, between applying <br />pressure gating test: <br />Test Start Time - <br />Initial Reading (R-) <br />Test End Time: <br />Final Reading (R-): <br />Test Duration <br />Change, in Reading <br />Pass I Fail Threshold or Criteria: <br />1mvcITTM <br />R <br />11 <br />> of -�ty <br />page.. <br />professional Engineer <br />industry standard <br />Hydrostatic <br />Vacuum <br />,psi <br />Equipment Resolution: F. <br />piping Run # <br />pipingRua # <br />PIPWg RU. 2 <br />■ <br />I--■ <br />- r, <br />vfog'faged tests) <br />iude matio# oonrepaks node prior to testjn& and <br />nded follow -Up fio <br />rew" <br />Comments — Olu info <br />
The URL can be used to link to this page
Your browser does not support the video tag.