Laserfiche WebLink
ONDAP <br />'y pjpF TESrMG <br />5- SEEManufacturer <br />m <br />Test Method Developed by: other (Specify) <br />by: pressure, <br />Test Method Developed other (Specify) <br />RESSURE <br />GAUGE <br />bT.jC—mt Equipment Used: <br />f PIPIn_Run /E <br />Piping mater <br />Piping Manu cturer. <br />piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping run isolation, <br />Wait t -,m,, between applying <br />pressure gating test: <br />Test Start Time - <br />Initial Reading (R-) <br />Test End Time: <br />Final Reading (R-): <br />Test Duration <br />Change, in Reading <br />Pass I Fail Threshold or Criteria: <br />1mvcITTM <br />R <br />11 <br />> of -�ty <br />page.. <br />professional Engineer <br />industry standard <br />Hydrostatic <br />Vacuum <br />,psi <br />Equipment Resolution: F. <br />piping Run # <br />pipingRua # <br />PIPWg RU. 2 <br />■ <br />I--■ <br />- r, <br />vfog'faged tests) <br />iude matio# oonrepaks node prior to testjn& and <br />nded follow -Up fio <br />rew" <br />Comments — Olu info <br />