Laserfiche WebLink
low <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> 490.1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION 490-2 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> i <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S-c <br /> I. FACILITY INFORMATION <br /> 1 <br /> FACILITY ID#(Agency Use Orly) <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> 103. CITY 104. i <br /> BUSINESS SITE ADDRESS Y <br /> II.EQUIP TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641) 490.3& <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-36 <br /> M.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. [12.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): 490-5 <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITL4L)SPACE(S)OR SECONDARY CONTAINMENT <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> 490.6 <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM <br /> 490.7. ' MODEL#: /EZ- C?(_i 490-9 <br /> PANEL MANUFACTURER: 490-10 <br /> � - -390.9 MODEL#(S): XLS <br /> LEAK SENSOR MANUFACTURER: 490 11 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL�TANK(@.(23 CCR§2643) 49x13 <br /> PANEL MANUFACTURER: 11. MODEL#: <br /> 490-14. MODEL#(S): 490-15 <br /> IN-TANK PROBE MANUFACTURER: 490-16 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY <br /> 490.17 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): _ <br /> 490.18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490.19 <br /> 490-20 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-21 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(TG)(23 CCR§264-5). TESTING PERIOD: ❑ a.36 H_OLTRS ❑ h.60 I401IRS 490.22 <br /> 490-23 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.24 <br /> +'i'�l <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490.26 <br /> ❑99.OTHER (Specify): 490.27 <br /> . IPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all t a <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br /> VISUAL ALARMS. (23 CCR§2636) 490-29 <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED 0c.PRESSURIZED ❑d.UNDER VACUUM 49x3 <br /> 490-30 MODEL#: <br /> PANEL MANUFACTURER: 490 3z 4 3 <br /> LEAK SENSOR MANUFACTURER: ; MODEL <br /> a.YES ❑b.NO 30- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ 490 35 <br /> AILURE/DISCONNECTION AUTOMATIC PUMP SHUTDOWN. ❑a-YES ❑b.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 39-Pt)1 OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 j 490.36 <br /> 490.37 MODEL#(S): Y 490- <br /> 38 <br /> MLLD MANUFACTURER(S): <br /> 490-39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§263 490-41 <br /> 49010. , MODEL#(S): <br /> ELLD MANUFACTURER(S) _ 49042 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ❑a.YES ❑b.NO 49043 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 490.44 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO <br /> 4.PIPE INTEGRITY TESTING 490.45 490-46490.47 <br /> TEST UENCY a.ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER S ecifv 490.48 <br /> 5.VISUAL PIPE MO T RING. <br /> FREQUENCY ❑ a.DAILY [-] b.WEEKLY Ipt c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- x90 0-9 <br /> Allowed for monitonag of m tried&mer cv ralor fuel n onl` er HSC 5281.5 <br /> 490-50 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(.)(3)1. <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER-6.7IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 490.52 <br /> 490-53 <br /> ❑ 99.OTHER(Specify) <br /> UPCF UST-D(12/2007)1/4 <br />