Laserfiche WebLink
UST STSTEH DRAWING INFORMATION <br /> 1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> -3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. „� Detail of tank, associated piping, excavation mid cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. (Title 23,,Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. S✓ Verification of product compatibility kith the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. -„NZ Manufacturerts written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (1®) and <br /> secondary Ce) containment systems before covering. !Section 2635 (a) (3) &,(4)1 <br /> 11. Tank integrity test required upon completion of instatlatioit with tank in operating condition. Test results to be <br /> submitted directly to PNS-END from the testing c=parry or owner of facility. [Health.& Safety Code, Division 20, <br /> Chapter 6.7, section 25291 (h)) <br /> 12. TANK CCHPOSITION <br /> TANK S <br /> CAPACITY too Lori 000 10)000 <br /> MANUFACTURER A r )( 6 <br /> COMPOSITION F lr <br /> EL <br /> PRODUCT 915UWL I SNL AD + !41 <br /> CORROSION PROTECTION '� l <br /> U.L. LISTED YE:S 'fes -Yes <br /> COMPATIBILITY WITH 1002 <br /> METHANOL 1�� <br /> 13.1 TANK(s) TO BE INSTALLED <br /> A. Steel•ctad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings.- <br /> (1) <br /> overings:(1) Tested at the installation site using an*electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> C3) Hydrostatic annular Cpriry tank pressure test). <br /> C. Morn-clad steel tank (Section 2635 Ca) (2). CA)) <br /> ® (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts; smashers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified at.,adequatt:by*a='; ^ <br /> corrosion specialist. <br /> (3) Impressed current system to-be inspected no less than every 60 days. <br /> 5 <br />