Laserfiche WebLink
19. ;cg;3 Piping (cross-sectional di+ including connections to tank and dispe, <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (B) or (C)], or <br /> — Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(03, or <br /> (B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) — Suction piping (below grade piping operates at less than atmospheric pressure) (Section 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pins installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> Primary piping-incontact with hazardous substance under normal operation conditions shall be: <br /> Installed inside a secondary containment system in the form of: secondary pipe Vault or <br /> tined trench to be sloped to a collection sump at the tow point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment wilt be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> 1, Automatic line leak detectors wilt be installed on pressurized piping <br /> Manufacturer: Model:_ LXZ.��Csa <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> / fails or is disconnected. <br /> 20. V State Vater Resources Control Board "Facility (A)u and "Tank Permit (8)"application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: <br /> (include source of information . borehole togs, monitoring well data, water <br /> studies, etc.) <br /> 23. Total number of tanks on site after instatlation: JJO "AjGe -' :3�A- &115 <br /> 24. County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility lin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workptan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209).469-3450. <br /> The oyner;or. operator must acknowledc•^ this responsibility for.workplan submittal by-signature and date below. <br /> N t P_ 2 StC 1 3' �� Title��„-aim 105Gz Date. �✓�lU� <br /> CONDITIONS OF APPROVAL: <br />