My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MA PRESSURE BELIEI: g ISO 9001 CERTIFIED: <br /> A standard FE Petro <br /> feature.When <br /> necessary during W <br /> maintenance to bleed _ R <br /> line pressure to zero,a . <br /> vent screw is provided. m< <br /> By turning this screw, <br /> product is diverted <br /> back to the tank, 4 <br /> to <br /> dropping line r� <br /> pressure to zero. <br /> _ � s <br /> .Pet- 9� 'quality commitment fio suPPly�rou <br /> � r into <br /> 3Reduc Fite eco a world class;product u i accordanceit�i fi <br /> t ifi Le arc spez�seF pa c t fi x. internationally recogn�zeeT qual ysta tc ards <br /> Al <br /> �a <br /> aid <br /> SIMPLE SERVICING: <br /> If ever required,the The FE Petro optional single phase motor control box <br /> pump can be easilyis available in two configurations.These control <br /> removed from the <br /> boxes are UL listed,CSA Certified or C-UL listed and <br /> tank by unthreading fit any horsepower FE Petro 4"submersible.Models <br /> three bolts.There is are available in both 120 volt and 220 volt coils for 50 <br /> ' no need to disconnect and 60 Hz power supplies.Please specify. <br /> the syphon system,or STP-CBS:Control Box with wiring <br /> remove the leak terminals,contactor relay <br /> detector from the and pilot light with lock <br /> system to service c . out toggle switch.One <br /> the STP. required per pump. <br /> Enclosure size is j Y <br /> $ L/16 1/ 1'X:7 "X 2 7/8u <br /> f2atEi1"� C11Ce� �} (216mm x 148mm x 73mm). <br /> STP-CBR4:Our 4 <br /> VERTICAL DISCHARGE: pump motor <br /> controller has relays <br /> Another unique feature of FE Petro.Provides for s <br /> a simple connection to underground piping. for 4 submersibles, <br /> plus voltage surge <br /> arrestors to arrest <br /> .� power surges over <br /> 500 volts.Enclosure size is 14"x ll"x 5" <br /> (3.56mm x 279mm x 127mm). <br /> r IFS:Our intake <br /> Filter screen <br /> option utilizes <br /> 316 stainless * ^' <br /> steel to filter <br /> particles atoo <br /> i r03- Y f`P'S <br /> �� r � n 009"(23mm)and larger.It can significantly <br /> ;r te`a alTC�w3€Q f;Wei� tt �Q e <br /> { � � reduce dispenser filter changes,reducing <br /> thM guzn tee the dzschare line azrrd reqs <br /> maintenance costs by 100's of dollars per year. <br /> eS, peeru� 5 �., <br />
The URL can be used to link to this page
Your browser does not support the video tag.