My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> POSMONS <br /> AA%m PU-P iia Pump <br /> e <br /> 5-14 Par <br /> r 1 -Position 1 is the PMMON 2-Wbea pn=m In the PCMITWN 3-If the pressure <br /> "tripped"or-reset-position.The LD- delivery system has reached 12-15 psi. continues to sire,the <br /> 2000 goes into this position when the the piston and poppet assembly moves LD-2000 will trove to <br /> pressure in the delivery system drops to to Position 2-the"teak poli- Position 3-the"full flow" <br /> 4 psi or less at the leak detector. tion. position.In position 3,the <br /> LD-2000 wM allow full <br /> ,miLthe reset position. the LD-2000 Is As the poppet moves to this position, flow of product fiom the <br /> to loon for a leak in the defivery the cross hate In the poppet centers submessible pump to enter <br /> esu the neat tame the submersible around the head in the metertrig pin. the <br /> pump Ls umied on.With the pump Since the head of the pin is consider- <br /> turned oa,the CA-2000 will allow ably larger than the shaft flow Is <br /> �Pmm ?IY 1.5 Ballasts of product restricted from 1.5 GPM to 3 GPH or <br /> per minute to enter the delivery system less. <br /> through a cross hole in the poppet. <br /> If there is a leak in the dellwn <br /> In Position 1,a portion of the cross system of 3 GPH or moom the pressure <br /> hole is positioned around the narrow in the delivery system will not rise, and <br /> part of the metering pin_Pmssure wgl the LD-2000 will stay to this position_If <br /> build very quickly to 12-15 psi.As the there is no leak In the defiverq system. <br /> pressure builds in the delivery system. the pressure will continue to rise. <br /> It also Increases under the piston in the <br /> top of the LD-2000.This pressure <br /> causes the piston and poppet to move <br /> upward. <br /> For further information about the LD-2000 or other leak detection equipment, <br /> .contact your local distributor or call. <br /> VAPORLESS MANUFP.CTUPJNGP INC- <br /> 9234-C East Valley Road - Prescott Valley, AZ 86314 <br /> 1-800-367-0185 - (602) 775-5191 - (602) 775-5309-FAX <br /> Ptened on Regded Peper trade to the Unieed Smws of Amato <br />
The URL can be used to link to this page
Your browser does not support the video tag.