My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV-12-98 THU 02:38 PM - P. 17 <br /> 1.0 INTRODUCTION <br /> This Health & Safety Plan is based on the work plan activities and <br /> the requirements of Title 29 of the Code of Federal Regulations, <br /> Section 1910 .120 (29 CFR 1910.120) . <br /> 2.0 WORK ACTIVITIES <br /> The following subsections provide a description of the various <br /> work performed at the site, -as well as health and safety hazards <br /> associated with each task. <br /> 2.1 SITESECURITY <br /> Access during all on-site activities will be restricted to <br /> authorized personnel_ All personnel and authorized visitors must <br /> contact the Site Foreman/Safety Coordinator prior to entering and <br /> exiting the site. <br /> 3.0 PX- SITE ORG"TZATION <br /> Each person shall he responsible for following the Health a <br /> Safety Plan's guidelines at the site. The Safety Officer is <br /> appointed Foreman and his duties are as follows: <br /> Ensure that the Health and Safety Plan is implemented; <br /> - Conduct "tailgate,' meetings on a weekly basis and <br /> document items discussed; <br /> - Conditions may change on site. Determine extent and <br /> conduct "tailgate" meetings on a Iasis that relates to <br /> conditions on site. Document items discussed. <br /> Stop work if the health and safety of workers is in <br /> question; <br /> Observe workers for signs and symptoms of exposure or <br /> heat stress; <br /> Evaluate the effectiveness of the personal protective <br /> equipment program on an ongoing basis and upgrade the <br /> program as needed; <br /> Inform the Field Supervisor of any deficiencies or <br /> changes in health and safety practices; <br /> Perform daily review of the work practices and <br /> compliances with this Health and Safety Plan; <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.