Laserfiche WebLink
F. la Tank Gauging/SIR Equipment: /11 heck this box if tank gauging is used only for inventory controL <br /> Cl Check this box if no tank gauging or SIR equipment is instancd. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring- <br /> Complete the fotlowi cheddist: <br /> ❑ Yes. Cl NO* Has all i%mut wising been inspected for proper entry and termination,including testing for ground faults? -Cl Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup?-- — - - <br /> ❑ Yes ❑ No* Was accuracyof sygem product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system wager level readings tested? <br /> Cl Yes ❑ No* Were all probes mmstalW properly? <br /> ❑ Yes ❑ No* Were all items on the egaipment mamufacxtuer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be eorrec&. <br /> G.Line Leak Detectors(LLD): ❑ check this box if U--Ds ane not installed. <br /> Com fete the follo ' cheddist: <br /> ba Yes ❑ NOT For oquipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Cluck all than apply) Simulated leak rate:A 3 gp h.: ❑0.1 g-ph; ❑02 gp.h. <br /> JQ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic UJX,docs the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑-Yes ❑ No* For el does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> A N/A or disconnected? <br /> 0 Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspegted? <br /> N/A " <br /> Yes . ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments- <br />