My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 4:16:13 PM
Creation date
6/3/2020 9:44:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3202\PR0231129\DIESEL TANK CONVERSION PLAN 2003.PDF
QuestysFileName
DIESEL TANK CONVERSION PLAN 2003
QuestysRecordDate
11/15/2011 8:00:00 AM
QuestysRecordID
162827
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. la Tank Gauging/SIR Equipment: /11 heck this box if tank gauging is used only for inventory controL <br /> Cl Check this box if no tank gauging or SIR equipment is instancd. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring- <br /> Complete the fotlowi cheddist: <br /> ❑ Yes. Cl NO* Has all i%mut wising been inspected for proper entry and termination,including testing for ground faults? -Cl Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup?-- — - - <br /> ❑ Yes ❑ No* Was accuracyof sygem product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system wager level readings tested? <br /> Cl Yes ❑ No* Were all probes mmstalW properly? <br /> ❑ Yes ❑ No* Were all items on the egaipment mamufacxtuer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be eorrec&. <br /> G.Line Leak Detectors(LLD): ❑ check this box if U--Ds ane not installed. <br /> Com fete the follo ' cheddist: <br /> ba Yes ❑ NOT For oquipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Cluck all than apply) Simulated leak rate:A 3 gp h.: ❑0.1 g-ph; ❑02 gp.h. <br /> JQ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic UJX,docs the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑-Yes ❑ No* For el does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> A N/A or disconnected? <br /> 0 Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspegted? <br /> N/A " <br /> Yes . ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments- <br />
The URL can be used to link to this page
Your browser does not support the video tag.