Laserfiche WebLink
SWROB,January 2002 Page 2. <br /> 9. SPILUOV ERFILL CONTAINMENT 110XES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: F] Spill Bucket Manufacturer F F Industry Standard El Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: F] Pressure F-1 Vacuum F] Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 87 Spill Box# 91 Spill Box# DSL Spill Box# <br /> Bucket Diameter: 14 14 14 <br /> Bucket Depth: 12 12 12 <br /> Wait time between applying <br /> pressure/vacutm Avater and 3 0 30 30 <br /> starting test: <br /> Test Start Time: 0930 0930 0930 <br /> Initial Reading(R 1 ): 7 7 7.5 <br /> Test End Time: 1030 1030 1030 <br /> Final Reading(RF ): 7 7 7.5 <br /> Test Duration: 1 HR 1 HR i HR <br /> Change in Reading(R F-RI ) 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />