My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:36:32 PM
Creation date
6/3/2020 9:45:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name:ConocoPhilli s Site#2705448 Date:3/21//06 <br /> Facility Address:3202 W.Hammer Lane <br /> City:Stockton Zip Code:95209 <br /> Desi ated UST Operator Conducting the Inspection:Julie Lee <br /> International Code Council Certification#:5248777-UC Expiration Date: 12/14/2006 <br /> r.q <br /> Phone:(510)245-5218 <br /> Signature: <br /> Y=Yes N=No NA=Not Applicable <br /> Item MONITORING PANEL/ALARM HISTORY Y N INA <br /> .,.,._s <br /> 1 Monitoring system is powered on and in proper operating mode. x <br /> 2 Monitoring system is not currently showing any alarms or warnings. x <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the x <br /> Designated UST Operator. Attach a copy of the alarm histo re ortllog to this orm i available. <br /> 4 Each alarm for the previous month has been responded to appropriately. x <br /> 5 Sensors located in tank-top containment sumps have not alarmed in the past month. x <br /> Sa _ List all tank-top sumps where alarms occurred in the past month: <br /> N/A <br /> Note:Sumps where an alarm has occurred in the past month must be inspected unless a qualified service technician responded to,and <br /> properly addressed,the cause of the alarm.Attach documentation verifying appropriate service to this report. <br /> /sum ins ection is required,record results in item 6,below. <br /> ..x, <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note:Visual inspection o sums is only required in sums where an alarm has occurred in thepast month or which there is no service record. <br /> Y Ns Y N <br /> ,ggi, <br /> Sump Location: Sump Location: <br /> Sump Location: Sump Location: <br /> Sump Location: Sum_p Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1—Contents:87 x Tank 3—Contents:91 x <br /> Tank 2—Contents:89 x Tank 4—Contents:Diesel x <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Y N NA Y N NA <br /> Dispenser 1/2 x Dispenser 9110 <br /> Dispenser 3/4 x Dispenser 11/12 <br /> Dispenser 5/6 x Dis enser 13/14 <br /> Dispenser 7/8 x Dis enser 15116 <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 9 Monitoring system certification has been completed within past 12 months. x <br /> 10 Secondary containment tests have been completed within the required timeframe. x <br /> 11 _§Pill containment structure bucket testing was completed within the past year. x <br /> 12 Tank tightness testing was completed within required timeframe. x <br /> 13 Line tightness testing was completed within required timeframe. x <br /> 14 Other required testing/maintenance was completed within required timeframe. List test/maintenance items below. <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> 15 All facility employees have received the required on-the-job training within the past year. x <br /> 16 All facili!X employees hired within the past 30 days have received the required on-the- training. Ix <br /> Note: Any answer of'IN"should be explained in the comment section on the following page,and will require <br /> follow-up action. <br /> Pagel of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.