Laserfiche WebLink
Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name:ConocoPhilli s Site#2705448 Date:8/29/06 <br /> Facility Address:3202 W.Hammer Lane <br /> City:Stockton Zip Code:95209 <br /> Designated UST Operator Conducting the Inspection:Julie Lee <br /> International Code Council Certification#:5248777-UC Expiration Date: 12/14/2006 <br /> Signature: .A'� e_lr Phone:(510)245-5218 <br /> Y=Yes N=No NA=Not Applicable <br /> Item MONITORING PANEL/ALARM HISTORY Y N NA <br /> 1 Monitoron and in proper operating mode. x <br /> 2 Monitoring system is not currently showing any alarms or warnings. x <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the Designated x <br /> UST Operator. Attach a c2E o the alarm history report/logNportlZog to thisform i available. <br /> 4 Each alarm for the previous month has been responded to appropriately. x <br /> 5 Sensors located in tank-top containment sumps have not alarmed in the past month. x <br /> 5a _ List all tank-top sumps where alarms occurred in the past month: <br /> N/A <br /> Note:Sumps where an alarm has occurred in the past month must be inspected unless a qualified service technician responded to,and <br /> properly addressed,the cause of the alarm.Attach documentation verifying appropriate service to this report. !f <br /> sum ins ection is re aired,record results in item 6,below. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note:Visual inspection o sum s is only re wired in sums where an alarm has occurred in thepast month or which there is no service record. <br /> Y N <br /> Sump Location: <br /> SuTp Location: ' <br /> Sump Location: Sum Location: <br /> rt r <br /> Sump Location: ,' . Sump Location: d, r <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1—Contents:87 x Tank 3—Contents:91 x <br /> Tank 2—Contents:89 x Tank 4—Contents:Diesel x <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located properl . <br /> Y N NA Y N NA <br /> Dispenser I/2 x Dispense 9110 <br /> Dispenser 3/4 x Dispenser 11/12 <br /> Dispenser 5/6 x Dispenser 13/14 <br /> Dispenser 7/8 x Dis enser 15/16 <br /> Y <br /> PAPERWORK INSPECTION Y N INA DATE DONE <br /> 9 Monitoring system certification has been completed within past 12 months. x <br /> 10 Seco dary containment tests have been completed within the required timeframe. x <br /> 11 Spill containment structure bucket testing was completed within the past year. x <br /> 12 Tank tightness testing was completed within required timeframe. x <br /> 13 Line tightness testing was completed within required timeframe. x <br /> 14 Other required testinglmaintenance was completed within required timeframe. List test/maintenance items below. <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING Y I N INA <br /> 15 All facility employees have received the required on-the-job training within the past year. x <br /> 16 All facility em to ees hired within the past 30 days have received the required on-the job trainin x <br /> Note: Any answer of°°N"should be explained in the comment section on the following page,and will require <br /> follow-up action. <br /> Page 1 of 2 <br />