Laserfiche WebLink
San Joaquin <br /> Environmental Health DepartmentDIRECTOR <br /> - P Donna Heran,REHS <br /> 1868 East Hazelton Avenue <br /> Q' a PROGRAM COORDINATORS <br /> Stockton, California95205-6232Robert McClellon,REHS <br /> :® <br /> Jeff Carruesco,REHS,RDI <br /> Kase <br /> cq •..•....• '�P <br /> Foley, <br /> HS <br /> Website:www.S/gov.org1ehd Linda Turkatte,REHS <br /> Phone: (209)468-3420 Rodney Estrada,REHS <br /> Fax: (209)464-0138 Adrienne Ellsaesser,REHS <br /> July 16, 2014 <br /> Veronica Freitas <br /> Walton Engineering, Inc. <br /> P.O. Box 1025 L <br /> West Sacramento, CA 95620 <br /> Re: 7-Eleven#35355 SR0070041 <br /> 3202 West Hammer <br /> Stockton, CA 95209 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to perform a cold start required for replacing existing CDIM with a <br /> new EDIM module of the Underground Storage Tank (UST) System. The permit has been <br /> approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work that requires replacing or repairing any components on the <br /> UST System. <br /> 3. Contact Jeffrey Wong at (209) 468-0335 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring, including audible alarm function, has been restored to meet <br /> the requirements of Title 23 California Code of Regulations and the Health & Safety <br /> Code. A copy of the alarm history shall be printed prior to performing the "cold start" <br /> of the Veeder Root system and made available at the time of EHD inspection. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> 4. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br /> a. One of several permissible valid, current contractor's licenses issued by the <br /> Contractors State License Board (may be issued to the installation company), or a <br /> Tank Tester's license issued to the individual by the State Water Board, and <br />